summer training report on manufacturing transformer downlodable
#1

i want summer training report on manufacturing of transformer.
Reply
#2

Shree Engineers thinking is driven by the commitment to quality. The complete in house manufacturing process helps us to ensure optimum quality of the transformer. We have complete testing facility to test and check all the major raw-materials used in manufacturing the transformer. CRGO laminations are cut and annealed in house to achieve minimum magnetic flux distortion. To ensure the best quality of the Coils of the transformer, winding wires and strips are also manufactured in house.

Fabrication section ensure the robustness, quality and fine finish of the tank and radiators of the transformer.

The manufacturing process of Transformer cover the following departments:-

Coil Winding
Core Assembly
Core-Coil Assembly
Tank-up
Transformer Tank
Painting & Finishing


Coil Winding

Coil Winding is of two types:-

High Voltage Coils: H.V. Coils are the components of finished transformers. They are made on automatic layer setting winding machines.
A solid cylindrical former of predetermined diameter and length is being used as hase over which is made.
Generally round insulated wire of either copper (Cu) or Aluminium (Al) is used as basic raw material.
The coils are made in number of layers.

The starting and finishing leads of each coil are terminated on either side of the coil.
These leads are properly sleeved and locked at number of points.

Low Voltage Coils:

L.V. Coils are also one of the components of transformer. The procedure of making low voltage coil is generally same as described earlier.
The shape of the basic raw-material (Al or Cu) is rectangular.
The Test: The "Turn Test" is carried out on the H.V. Coils as per the specifications.

Core Assembly

The basic raw-material is COLD ROLLED GRAIN ORIENTED (CRGO) Silicon Steel
It is in the form of thin sheets & cut to size as per design.
Generally three different shapes of core laminations are used in one assembly.
Notching is performed to increase the magnetic path.
The laminations are put through annealing process.
These laminations are assembled in such a manner that there is no air gap between the joints of two consecutive sheets.
The entire assembly is done on a frame commonly known as core channel. These frames being used as a clamping support of the core assembly.

Core - Coil Assembly

The components produced in the coil winding and core assembly stage are then taken into core-coil assembly stage.
The core assembly is vertically placed with the foot plate touching the ground. the top yoke of the core is removed. The limbs of the core are tightly wrapped with cotton tape and then varnished.

Cylinder made out of insulating press board/ pressphan paper is wrapped on all the three limbs.
Low Voltage Coil is placed on the insulated core limbs.

Insulating block of specified thickness and number are placed both at the top and bottom of the L.V.Coil.
Cylinder made out of corrugated paper or plain cylinder with oil ducts are provided over L.V.Coil.
H.V. Coils are placed over the cylinder.

Gap between each section of H.V. Coils including top & bottom clearances is maintained with the help of oil ducts, as per the design/drawings.

The Top Yoke is refilled. Top core frame including core bolts and tie rods are fixed in position.
Primary and secondary windings are connected as per the requirements. Phase barrier between H.V. phases are placed as per requirement.
Connections to the tapping switch (if required) are made.
Finally, the component is placed in the oven.

Tank Up

The core-coil assembly and tank supplied by the fabrication deptt. are taken into tank-up stage. The procedure is :

The core-coil assembly is taken out of the oven and the "Megger test" is carried out.
Only if the megger value is as per the specification, the assembly may be taken for tank-up.
The tanks, supplied by fabrication deptt. are brought to tank-up department duly painted.
Fittings like drain valves, HV& LV Bushings, conservator, oil level indicator and explosion vent are fitted in the tanks.
The Core-coil assembly is then placed into the tank and properly locked up.
Pure filtered transformer oil is filled in the tank to immerse the assembly only.
Connections of primary and secondary to the terminal bushings are made. Operating handle for ratio switch is fitted, wherever required.

Transformer Tank

We, at SHREE ENGINEERS have a state-of-art in-house facility for manufacturing transformer tanks.
All tanks are made of high quality steel and can withstand vaccum as specified by the international standards and the customer. All welds are tested, ensuring 100% leakproof of seems and mechanical strength. Trasnformera with Corrogated Fin-Type radiators can aslo be supplied. The fins are manufactured of Gold-rolled steel.The fin height and length are according to customer's specifications and fins can be plain or embossed. All transformer tanks are given a smooth finishing by using the "SHOT BLASTING" process.

Paint process

Painting : The entire procedure of painting is done under two stages:

Cleaning of tanks

The cleaning of tank is done normally by chipping/grinding.
The outside surface of the tank is short blasted to achieve a very fine and smooth finish

Painting of tanks

After cleaning the tanks, a coat of hot oil resistence paint is applied on the internal surface of the tank.
The outside surface is painted with a coat of Red Oxide primer and subsequently with one coat of enamel paint as per customer's requirement.

Finishing

Fittings and accessories as per customer's specification and drawing are checked.
Air Pressure test is subjected to avoid any leakage and seepage on all transformer.
Transformers are filled with oil upto the minimum level marking, wherever necessary.
Loose accessories like, earthing terminals, bimetallic connectors, dial type thermometers are also checked for proper fittings.


Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: pdf on manufacturing transformer download, transformer manufacturing, comnditioning monitoring of transformer training report, project of manufacturing transformer, report on transformer manufacturing in pdf download, transformer training report pdf download, pdf download on transformer training,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  vijayawada bsnl summer internship 2 1,528 16-05-2018, 12:14 PM
Last Post: sandhya angelina
  manufacturing tech 2 vijayaraghavan book full download 2 1,819 16-11-2017, 07:38 AM
Last Post: Glokesh
  when are the application for lilitha nursing training 2016 1 7,515 07-04-2017, 12:40 PM
Last Post: jaseela123d
  when are the application for lilitha nursing training 2016 1 904 27-03-2017, 10:49 AM
Last Post: jaseela123d
  shanzu teachers training college fee structure 3 1,242 28-02-2017, 09:29 AM
Last Post: jaseela123d
  lilitha nursing training college 2017 intake 6 1,704 24-02-2017, 12:11 PM
Last Post: jaseela123d
  dlw summer training application form 2016 17 5 2,048 10-02-2017, 04:41 PM
Last Post: Arun Kumar yadav
  lilitha nursing training college 2017 intake 4 1,628 27-11-2016, 10:54 PM
Last Post: phelokazi khwele
  lilitha nursing training college 2017 intake 4 1,391 14-10-2016, 05:01 PM
Last Post: masbulele
  manufacturing of railway wheels ppt 4 1,153 14-10-2016, 11:28 AM
Last Post: ashwiniashok

Forum Jump: