summer training in jaipur metro for civil
#1

Hello sir I am student of civil 3rd year . I want to summer training in jaipur mero.
Plzz help me sir !!!
Reply
#2

Jaipur Metro (Hindi: जयपुर मेट्रो) is a fast transit system in the city of Jaipur, Rajasthan, India. Construction on the largely elevated part of the first line, called Phase 1A, which comprises 9.63 kilometers (5.98 kilometers) from Mansarovar to Chandpole Bazaar, began on November 13, 2010 and was completed in 2014. The Commercial execution of the project was delayed until December 2014 and then until April 2015. After receiving the safety permit from the Metro Railway Safety Commissioner (CMRS) in May 2015, Jaipur Metro began the commercial service between Chandpole and Mansarovar on 3 June 15, 2015. The Jaipur Metro System is India's Sixth Subway Railway System After those in Kolkata, Delhi NCR, Bangalore, Gurgaon and Mumbai. It is also touted as one of the fastest metro systems built in India.


Jaipur Metro is the first metro in India to run on dual floor elevated road and subway track. With the rapid industrialization and commercial development of Jaipur, along with a growing population, the city's transportation infrastructure found itself overburdened. As a result, the government reflected on the establishment of Jaipur Metro in the Delhi Metro lines which had proven to be a great success.

[Image: 275px-Jaipur_Metro_on_Double_Storey.jpg]

The Jaipur Metro Rail Corporation Ltd., abbreviated to JMRC, is a state company operating the Jaipur Metro. The Jaipur Metro Rail Corporation Ltd. was created on January 1, 2010 with Nihal Chand Goel as Managing Director. Among India's fast transit systems, it has registered the fastest driving test run after construction began when the trial was launched in Jaipur on September 18, 2013 marked by then-chief Minister of Rajasthan Shri Ashok Gehlot.

Physical construction work on the Jaipur Metro began on February 24, 2011. The JMRC consulted the DMRC on rapid transit construction and operation techniques. The first line of the Jaipur metro was opened to the public by Vasundhara Raje, the chief minister of Rajasthan, on June 3, 2015, and thus became the sixth fast transit system in India. The first phase of the project is expected to be completed in 2018.

The Jaipur metro is being built in 2 phases. Phase I consists of the Pink Line and Phase II consists of the Orange Line. Currently, the Rosa Line is under construction. The implementation of Phase 1A of the project (Mansarover to Chandpole with a length of approximately 9.63 km), including civil works, permanent road, depot and traction and power supply, etc., was being managed by The DMRC. The AFC, Telecom and Chaupar to Chandpole). Phase I-A completed 9 stations and 9.63 kilometers (5.98 miles) of route length, of which 0.95 kilometers (0.59 miles) is underground and 9.13 kilometers (5.67 miles) is high.

The rest of the first line, Phase IB (2,349 kilometers, 2 stations), is scheduled to be completed by 2018. Phase II (23,099 kilometers, 20 stations) is planned to be completed by 2021. With the completion of Phases 1 and II, the network will cover 35,078 kilometers (21,796 miles) and 31 stations.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: jaipur metro corporation summer internship programis pdf download, intership indelhi metro for civil engineering, summer training for civil engineering in jaipur, jaipur metro civil engineering ppt, how to get internship at jaipur metro in civil, i want training in civil engineering jaipur, summer internship for civil in jaipur,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  Summer internship in verka milk plant, Amritsar 0 1,479 21-02-2023, 02:07 PM
Last Post:
  Summer internship in verka milk plant , Amritsar. 0 1,434 21-02-2023, 02:05 PM
Last Post:
  vocational training report 0 638 18-11-2020, 03:08 PM
Last Post:
  Summer training pdf 0 1,294 29-02-2020, 05:48 PM
Last Post:
  Graduate engineering training 0 1,857 29-12-2018, 06:38 PM
Last Post:
  Pwd training report 0 1,891 23-11-2018, 12:40 AM
Last Post:
  civil engineering extensive survey project report 0 2,230 03-11-2018, 11:26 PM
Last Post: Guest
  pwd summer training for mechanical 0 1,989 02-11-2018, 01:06 PM
Last Post: Guest
  industrial training report on 132 33 11 k v substation 0 8,559 29-10-2018, 12:20 PM
Last Post: Guest
  indian railway summer training report for ee 0 1,835 23-10-2018, 02:37 PM
Last Post: Guest

Forum Jump: