summer internship in jaipur metro
#1

I am a student of Third Year B-Tech electrical Engineering studying in Arya college of engineering and information technology, jaipur

I want to do internship in your organization for a short time period during vacation.

You are requested to kindly help me providing your terms and conditions.

Thanking you
Sourabh singh khati
Father – Mr. Mansingh khati
C-10 Forman colony RTM
Bhawaniandi , Rajasthan
Mob: 7790902013
Reply
#2
Jaipur Metro (Hindi: जयपुर मेट्रो) is a fast transit system in the city of Jaipur, Rajasthan, India. Construction on the mostly elevated part of the first line, called Phase 1A, comprising 9.63 kilometers (5.98 miles) from the Mansarovar route to the Chandpole bazaar, began on November 13, 2010,   and was completed in 2014 The commercial operation of the project was delayed until December 2014 and then until April 2015. After receiving the safety authorization from the Metro Rail Safety Commissioner (CMRS) in May 2015, Jaipur Metro began the commercial service between Chandpole and Mansarovar On June 3, 2015. The Jaipur metro system is the sixth Metro rail system after those of Kolkata, Delhi NCR, Bangalore, Gurgaon and Mumbai. It is also touted as one of the fastest metro systems built in India. Jaipur Metro is the first metro in India to run on dual floor elevated road and subway track.


With the rapid industrialization and commercial development of Jaipur, along with a growing population, the city's transportation infrastructure found itself overburdened. As a result, the government reflected on the establishment of Jaipur Metro in the Delhi Metro lines which had proven to be a great success. The Jaipur metro is being built in 2 phases. Phase I consists of the Pink Line and Phase II consists of the Orange Line. Currently, the Rosa Line is under construction.  The management of Phase 1A of the project (Mansarover to Chandpole, with a length of about 9.63 km), including civil works, permanent way, depot and traction and power supply, etc. The AFC, Telecom and Chaupar to Chandpole). Phase I-A completed 9 stations and 9.63 kilometers (5.98 miles) of route length, of which 0.95 kilometers (0.59 miles) is underground and 9.13 kilometers (5.67 miles) is high.

The rest of the first line, Phase IB (2,349 kilometers, 2 stations), is scheduled to be completed in 2018. Phase II (23,099 kilometers, 20 stations) is planned to be completed by 2021. With the completion of Phases 1 and II, the network will cover 35,078 kilometers (21,796 mi) and 31 stations.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: hcl internship 2013 in jaipur, reil jaipur summer internship, summer training in metro jaipur, metro bank summer internship, summer internship 2013 in jaipur for mechanical student, summer training jaipur metro address, bsnl summer internship jaipur,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  Summer internship in verka milk plant, Amritsar 0 1,479 21-02-2023, 02:07 PM
Last Post:
  Summer internship in verka milk plant , Amritsar. 0 1,436 21-02-2023, 02:05 PM
Last Post:
  Summer training pdf 0 1,294 29-02-2020, 05:48 PM
Last Post:
  pwd summer training for mechanical 0 1,989 02-11-2018, 01:06 PM
Last Post: Guest
  indian railway summer training report for ee 0 1,835 23-10-2018, 02:37 PM
Last Post: Guest
  vijayawada thermal power station internship contact details 0 853 17-10-2018, 11:36 AM
Last Post: Guest
  irrigation summer training report for civil engineer in pdf 3 3,267 07-10-2018, 02:00 PM
Last Post: [email protected]
  vijayawada thermal power station internship contact details 1 876 01-10-2018, 04:41 PM
Last Post: Guest
  summer training report gorakhpur railway 0 1,400 29-09-2018, 03:11 PM
Last Post: Guest
  vijayawada railway station summer internship 1 904 28-09-2018, 07:12 PM
Last Post: Guest

Forum Jump: