SUITABILITY OF BRIDGE MADE WITH PRECAST COMPONENTS IN AREAS OF HIGH OR MODERATE SEISM
#1

SUITABILITY OF BRIDGE MADE WITH PRECAST COMPONENTS IN AREAS OF HIGH OR MODERATE SEISMISITY

Presented By:
Bijan Khaleghi1

Abstract

The need for rapid construction arises from the inevitable increases in traffic congestion that have occurred in the past few decades, and the corresponding costs and safety manifested in many forms, including exposure of workers to traffic hazards, and most importantly, the waste of time due to delays. Prefabricated bridge components are in increasing demand for accelerated bridge construction. Precasting eliminates the need for forming, casting, and curing of concrete in the work zones, making bridge construction safer while improving quality and durability. This paper provides an overview of WSDOT precast bridges, relevant research and bridge projects using precast members.

Introduction
Precast concrete bridge systems provide effective and economical design solutions for new bridge construction as well as for the rehabilitation of existing bridges. Proper seismic design begins with a global analysis of the structure and a detailed evaluation of the connections between precast components as well as the connections between superstructure and the supporting substructure system. The system must be made to protect the superstructure from force effects due to ground motions through fusing or plastic hinging. In seismic regions, provisions must be made to ensure ductile behavior in both longitudinal and transverse directions. Studies have already been carried out to investigate seismic resistance and rapid construction. Requiring both characteristics together poses some special problems. While precast concrete is used to speed site assembly of components, the locations of the structural connections are critical. Transportation constraints point towards the use of line members, such as beams and columns, yet these lead to the need for making connections where bending moments are largest and inelastic behavior is virtually inevitable.


read full report
http://pwri.go.jp/eng/ujnr/tc/g/pdf/24/2...aleghi.pdf
Reply
#2
[attachment=5071]

SUITABILITY OF BRIDGE MADE WITH PRECAST COMPONENTS IN AREAS OF HIGH OR MODERATE SEISM
Abstract


The need for rapid construction arises from the inevitable increases in traffic congestion that have occurred in the past few decades, and the corresponding costs and safety manifested in many forms, including exposure of workers to traffic hazards, and most importantly, the waste of time due to delays. Prefabricated bridge components are in increasing demand for accelerated bridge construction. Precasting eliminates the need for forming, casting, and curing of concrete in the work zones, making bridge construction safer while improving quality and durability. This paper provides an overview of WSDOT precast bridges, relevant research and bridge projects using precast members.

Introduction
Precast concrete bridge systems provide effective and economical design solutions for new bridge construction as well as for the rehabilitation of existing bridges. Proper seismic design begins with a global analysis of the structure and a detailed evaluation of the connections between precast components as well as the connections between superstructure and the supporting substructure system. The system must be made to protect the superstructure from force effects due to ground motions through fusing or plastic hinging. In seismic regions, provisions must be made to ensure ductile behavior in both longitudinal and transverse directions. Studies have already been carried out to investigate seismic resistance and rapid construction. Requiring both characteristics together poses some special problems. While precast concrete is used to speed site assembly of components, the locations of the structural connections are critical. Transportation constraints point towards the use of line members, such as beams and columns, yet these lead to the need for making connections where bending moments are largest and inelastic behavior is virtually inevitable.


Reference: http://studentbank.in/report-suitability...z11TmisN00
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: microprocessor components, ppts of plant made pharmaceuticals, sensor network bridge, top 10 best movie ever made, precast structure, electronic suspension components, ppt on dc generator components,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  HIGH PERFORMANCE CONCRETE science projects buddy 2 5,185 27-02-2014, 12:36 AM
Last Post: Guest
  Analysis of durability of high performance concrete using artificial neural networksa smart paper boy 1 2,437 16-11-2012, 11:52 AM
Last Post: seminar details
  HIGH PERFORMANCE CONCRETE (HPC) – A SOLUTION TO VARIOUS PROBLEMS project report helper 3 4,166 16-11-2012, 11:52 AM
Last Post: seminar details
  High performance concrete bridges smart paper boy 1 2,278 19-10-2012, 01:37 PM
Last Post: seminar details
  EFFECT OF FIBRES ON ULTRA HIGH PERFORMANCE CONCRETE WALL PANELS summer project pal 1 2,508 19-10-2012, 01:36 PM
Last Post: seminar details
  suspension bridge presentation seminar presentation 3 7,424 16-10-2012, 12:35 PM
Last Post: seminar details
  Quantification of Damage Index for High Rise Building smart paper boy 0 2,184 27-07-2011, 09:27 AM
Last Post: smart paper boy
  SEISMIC ANALYSIS OF THE CABLE-STAYED BRIDGE full report project topics 0 1,530 08-04-2011, 03:19 PM
Last Post: project topics
  The nano-mechanical signature of Ultra High Performance Concrete by statistical nano seminar class 0 2,018 15-03-2011, 10:28 AM
Last Post: seminar class
  Segmental Bridge Construction seminar class 0 3,714 08-03-2011, 04:32 PM
Last Post: seminar class

Forum Jump: