Substation Electrical Interview Questions - Answers

What are the different substation components
Answer: Circuit Breakers, Disconnecting switches, Grounding switches, Current Transformers, Potential Transformers or Capacitor voltage Transformers, Line Traps, Lightning Arrestors, Power Transformers, Shunt Reactors, Current limiting reactors, Station Buses and Insulators, Grounding system, Series capacitors and shunt capacitors.
What are different types of busbar arrangement Schemes in Substations?
Answer: Different switching schemes or busbar arrangement scheme employed in switch-yard are:
Single Bus Scheme
Double bus single breaker scheme
Main and Transfer busbar scheme
Double bus single breaker scheme
Breaker and half scheme
Ring main bus scheme
Which type of bus arrangement is costlier and more reliable?
Answer: One and half breaker scheme is most reliable and costlier scheme. In one and half breaker scheme 3 circuit breakers are provided for 2 bus-bars. Hence the name is coined as One and half breaker scheme

For distribution network which type of Switching scheme is employed?
Answer: For distribution network Ring Main busbar scheme is employed. It has the provision that if power interruption occurs to one bus section due to maintenance or fault, power can be fed the bus from other side of the power system.

Factors on which material of station busbar depends?
Answer: Some of the factors on which station busbar depends are:
Current Carrying capacity
Short Circuit Stresses
Establishing minimum electrical clearances
What are the different electrical clearances in Substation?
Answer:
Ground Clearance: This is the minimum distance between any live conductor and the earth or ground.
Phase Clearance: It is the clearance between the different phases in a circuit or same phases in different circuits
Sectional Clearance: This is the minimum clearance between the live conductor and the limits of work, where spacial clearance is related to the safety of the operating personnel. The limits of work section may be ground or the platform on which the person is working.
Reply
#3
Substation Electrical Interview Questions - Answers
Substation Question and Answers:
What are the different substation components
Answer: Circuit Breakers, Disconnecting switches, Grounding switches, Current Transformers, Potential Transformers or Capacitor voltage Transformers, Line Traps, Lightning Arrestors, Power Transformers, Shunt Reactors, Current limiting reactors, Station Buses and Insulators, Grounding system, Series capacitors and shunt capacitors.
What are different types of busbar arrangement Schemes in Substations?
Answer: Different switching schemes or busbar arrangement scheme employed in switch-yard are:
Single Bus Scheme
Double bus single breaker scheme
Main and Transfer busbar scheme
Double bus single breaker scheme
Breaker and half scheme
Ring main bus scheme
Which type of bus arrangement is costlier and more reliable?
Answer: One and half breaker scheme is most reliable and costlier scheme. In one and half breaker scheme 3 circuit breakers are provided for 2 bus-bars. Hence the name is coined as One and half breaker scheme

For distribution network which type of Switching scheme is employed?
Answer: For distribution network Ring Main busbar scheme is employed. It has the provision that if power interruption occurs to one bus section due to maintenance or fault, power can be fed the bus from other side of the power system.


Factors on which material of station busbar depends?
Answer: Some of the factors on which station busbar depends are:
Current Carrying capacity
Short Circuit Stresses
Establishing minimum electrical clearances
What are the different electrical clearances in Substation?
Answer:
Ground Clearance: This is the minimum distance between any live conductor and the earth or ground.
Phase Clearance: It is the clearance between the different phases in a circuit or same phases in different circuits
Sectional Clearance: This is the minimum clearance between the live conductor and the limits of work, where spacial clearance is related to the safety of the operating personnel. The limits of work section may be ground or the platform on which the person is working.


Read more: http://electricalquestionsguide.blogspot...z4EASR476f
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: electrical substation design ppt, hindi me electrical quition and answer, electrical short question and answer in hindi, electrical interview questions, objective question electrical diploma interview, study report on electrical substation, bsnl electrical substation ppt,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
Photo pdf download of tata steel apprentice exam previous year solved question papers 4 12,324 08-08-2018, 08:23 PM
Last Post: Guest
  pdf k53 learners test questions and answers 2015 pdf 2 11,123 18-05-2018, 06:21 PM
Last Post: Guest
  viva question answer of flywheel experiment pdf 2 3,729 22-02-2018, 03:12 PM
Last Post: Guest
  upcatet previous year question paper pdf 2 2,046 06-04-2017, 11:28 AM
Last Post: Guest
  college of health kintampo interview list 1 923 27-09-2016, 12:15 PM
Last Post: ijasti
  the interview list of 2016 17 of kintampo college of health 1 1,108 24-08-2016, 04:07 PM
Last Post: ijasti
  the interview list of 2016 17 of kintampo college of health 1 913 24-08-2016, 10:11 AM
Last Post: ijasti
  132 33 kv substation training report pdf file download 2 2,003 08-08-2016, 04:02 PM
Last Post: Guest
  industrial visit report of pothencode substation 220kv 2 1,105 28-07-2016, 04:10 PM
Last Post: jaseela123d
  solved question papers of tisco apprentice 2 1,307 27-07-2016, 11:03 AM
Last Post: seminar report asees

Forum Jump: