structure and function of biogas plant pdf
#1
Wink 

structure and function of biogas plant pdf
Reply
#2

The biogas plant has a vaulted structure built with bricks. A mixture of cow dung, vegetable waste, crop residues, etc. It is mixed with water and becomes a thick suspension and is fed to the digester. The digester is a sealed chamber in which there is no oxygen. Anaerobic microorganisms that do not require oxygen decompose or decompose complex compounds of cow manure to generate gases such as methane, hydrogen and hydrogen sulfide. The biogas is stored in the gas tank on the digester from which they are extracted through the pipes for use. The remaining grout is periodically removed and can be used as an excellent fertilizer rich in nitrogen and phosphorus.

The function of the biogas plant depends on physicochemical factors such as temperature and the nature of the raw material. Also include pretreatment, co-digestion for nutrient balance, mixing and hydraulic retention time (the days when the slurry remains in the digester before being ejected).

The higher temperature, higher the reaction rate and the production of biogas approximately 40 ° C is generally considered as the optimum temperature for the production of biogas, depending on the organic material. Some research has shown 37 to 45 oC as the optimum temperature for the maximum production of biogas. The pH ratio of (6.5 -7.2) Carbon to Nitrogen of 27 is generally considered as optimal values.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: biogas bottling plant, structure of bio gas function, structure of a biogas plant, structure and function ot lipid, structure of biogas plants, about the structure and function of the biogas plant information in kannada, biogas plant,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  Anchoring script for talent function 0 4,538 10-08-2023, 11:24 AM
Last Post:
  Summer internship in verka milk plant, Amritsar 0 1,521 21-02-2023, 02:07 PM
Last Post:
  Summer internship in verka milk plant , Amritsar. 0 1,466 21-02-2023, 02:05 PM
Last Post:
  well-spring some homemade barbecue backchat and moistureless rubs and the actuality 0 1,057 10-09-2019, 05:48 PM
Last Post:
  agent some homemade barbecue cheek and prosaic rubs and suit 0 972 10-09-2019, 07:04 AM
Last Post:
  pass some homemade barbecue coolness and arid rubs and module 0 931 09-09-2019, 06:35 PM
Last Post:
  anchoring script for silver jubilee function of school 3 17,597 12-01-2019, 10:28 PM
Last Post: andrea
  anchoring script for get together function in marathi 0 11,194 09-11-2018, 09:48 PM
Last Post: Guest
  anchoring script for function in kannada pdf 0 11,033 01-11-2018, 06:52 AM
Last Post: Guest
  script for anchouring for formal function in freshers party 0 5,985 23-10-2018, 11:30 PM
Last Post: Guest

Forum Jump: