RATE & DELAY GUARANTEES PROVIDED BY CLOSE PACKET SWITCHES WITH LOAD BALANCING
#1

RATE & DELAY GUARANTEES PROVIDED BY CLOSE PACKET SWITCHES WITH LOAD BALANCING

Abstract: In this paper, we consider an overarching problem that encompasses both performance metrics. In particular, we study the network capacity problem under a given network lifetime requirement. Specifically, for a wireless sensor network where each node is provisioned with an initial energy, if all nodes are required to live up to a certain lifetime criterion, Since the objective of maximizing the sum of rates of all the nodes in the network can lead to a severe bias in rate allocation among the nodes, we advocate the use of lexicographical max-min (LMM) rate allocation. To calculate the LMM rate allocation vector, we develop a polynomial-time algorithm by exploiting the parametric analysis (PA) technique from linear program (LP), which we call serial LP with Parametric Analysis (SLP-PA). We show that the SLP-PA can be also employed to address the LMM node lifetime problem much more efficiently than a state-of-the-art algorithm proposed in the literature. More important, we show that there exists an elegant duality relationship between the LMM rate allocation problem and the LMM node lifetime problem. Therefore, it is sufficient to solve only one of the two problems. Important insights can be obtained by inferring duality results for the other problem.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: projected bond rate, where pipe type earthing is provided, internet load balancing, absentisum rate inindian idustries, banking information in marathi pdfclass packet switchs and load balances, switches ppt, wireless remote light switches,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  Microcontroller-Based Heart-Rate Meter project report helper 12 8,980 16-03-2013, 10:05 PM
Last Post: Guest
  High Speed Downlink Packet Access (HSDPA) – A Means of Increasing Downlink Capacity smart paper boy 1 1,532 08-12-2012, 02:45 PM
Last Post: seminar details
  SHORT TERM LOAD FORECASTING USING ARTIFICIAL NEURAL NETWORKS AND FUZZY LOGIC seminar class 1 2,891 06-12-2012, 01:03 PM
Last Post: seminar details
  Load forecasting jaygajjar 3 3,283 06-12-2012, 01:03 PM
Last Post: seminar details
  over-under voltage cut-off with ON-Time delay PROJECT REPORT project topics 3 5,334 01-12-2012, 12:23 PM
Last Post: seminar details
  Economic Dispatch with Environmental Considerations Using Marginal Rate seminar class 1 1,261 16-11-2012, 12:25 PM
Last Post: seminar details
  On-line emission and economic load dispatch using adaptive Hopfield neural network computer science topics 4 3,390 24-10-2012, 04:02 PM
Last Post: seminar details
  Heart rate display using micro controller seminar class 8 5,523 03-02-2012, 09:57 AM
Last Post: seminar addict
  DETECTING MALICIOUS PACKET LOSSES seminar class 1 2,090 01-02-2012, 10:05 AM
Last Post: seminar addict
  Economic Load Dispatch seminar class 1 3,894 27-01-2012, 10:45 AM
Last Post: seminar addict

Forum Jump: