railway track maintenance
#1

plz help me....i have to present a detailed report on railways,its advancements,maintenance,modern methods &mechanisation of railways....etc...plz help for making abstract n all......
Reply
#2
[attachment=6590]
RAILWAY TRACK TRACER
OBJECTIVE:

Our project “railway track tracer” automatically traces the track discontinuity several kilometers ahead and alarms near by station and the
Train about the track discontinuity.



ABSTRACT:


 In our project, we use series of sensors which senses the continuity of the track by sensing the vibration in the track.

 When a train passes its vibration in track it travels with very great velocity than the train velocity so that it can be detected several kilometers ahead before the train.




METHODOLOGY:
Overview:

In our project we use a series of sensors which detect the vibrations from the track. The output of the sensors are fed to the switching and rectifying circuit which processes the sensed signal ready to feed for the microcontroller. The processed signals are first fed to the opto couplers, output of which is fed to the microcontroller. The microcontroller decides from the received signal about the track discontinuity, and when a discontinuity is found in the track.


Block 1: Series of Sensors

We place the sensors at regular intervals in the track which senses the vibrations in the track when a train arrives. When a train moves with greater velocity the vibrations are experienced in the track for few kilometers ahead. The sensors capture these vibrations and pass them for processing.

Block 2: Switching and the Rectifying circuit

Every single sensor output is fed to a switching and rectifying circuit to determine the strength of vibration from the sensor and to process it to be suitable for the next level. Every switching circuit and the sensor pair is considered as a set (S1, S2, S3 and so on). Every set is connected to the microcontroller with suitable processing.
Block 3: Couplers


The couplers are the bridge between microcontroller and the switching circuit which prevents the microcontroller getting damaged from the high voltages.

Block 4: Microcontrollers


We use series of the microcontrollers to decide the defect area and the defect in the track.
Every slave microcontrollers (M1, M2, M3 and so on) are connected directly to the output of the few sets (S1, S2, S3) and the masters are connected to many slave microcontrollers. The slave micro controller decides the defect from processed signal. And the master controller detects the exact location of the defect area.

Block 5: Alarm signal

When a defect is detected the master signal is generated from the master controller which is connected to a necessary alarm device to warn the control room of the railways or the near by station or the train itself.

Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: track maintenance ppt, uses of railway track robot, where will the f1 track be in austin, ppt on maintenance of railway track, electricity genrated by railway track project, railway maintenance ppt, f1 track cyprus,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  MICROCONTROLLER BASED AUTOMATIC RAILWAY GATE CONTROL full report project topics 49 57,882 10-09-2015, 03:18 PM
Last Post: seminar report asees
  Automatic Railway Gate Control and Track Switching full report project topics 14 24,980 23-04-2013, 05:54 PM
Last Post: Ramachandra c
  track railway gate controlling using 8051 microcontroller project report helper 5 3,667 23-04-2013, 04:12 PM
Last Post: Guest
  Automatic Railway Gate Controller Using Stepper Motor full report project report tiger 16 20,097 09-03-2012, 09:25 AM
Last Post: seminar paper
  avoid railway accidents at unattended railway gates using 8051 microcontroller computer science technology 2 7,283 19-01-2012, 09:46 AM
Last Post: seminar addict
  AUTOMATIC CONTROL FOR UNMANNED RAILWAY GATE-EMBEDDED BASED PROJECT project topics 2 3,895 07-12-2011, 09:46 AM
Last Post: seminar addict
  Rotating Electromagnetic Field for Crack Detection in Railway Tracks smart paper boy 0 1,828 02-08-2011, 04:23 PM
Last Post: smart paper boy
  GSM AUTOMATED AND UNMANNED CONTROL SYSTEM OF RAILWAY CROSSING smart paper boy 0 1,139 21-07-2011, 11:59 AM
Last Post: smart paper boy
  Static Converter for Railway seminar class 0 1,495 14-05-2011, 10:05 AM
Last Post: seminar class
  METHOD OF ACCIDENT PREVENTION USING INTELLIGENT CONTROL SYSTEM FOR RAILWAY TRANSPORT seminar class 0 2,168 07-05-2011, 03:37 PM
Last Post: seminar class

Forum Jump: