procedure for inplant training for thermal power plant in mettur
#1

Sir i am doing 2 nd year eee in k9ngu engineering college. We planted to attend ipt in mettur thermal on may 17-21. How can i got application form to get permission. Please send the page link to take the application form
Sir i am doing 2 nd year eee in k9ngu engineering college. We planted to attend ipt in mettur thermal on may 17-21. How can i got application form to get permission. Please send the page link to take the application form
Reply
#2

The Mettur Thermal Power Station is a coal-fired electric power station located in Salem district of Tamil Nadu. It is operated by Tamil Nadu Generation and Distribution Corporation Limited. The power station was commissioned during various periods from 1987 and this is the first inland thermal Power Station of TANGEDCO.The coal from Mahanadi Coalfields Limited (Talcher and Ib Valley) and Eastern Coalfields Limited (Raniganj and Mugma) are transported to the load ports of Paradip (Orissa), Vizag (Andhra Pradesh) and Haldia (West Bengal). Thereafter the coal is transported to the discharge ports of Ennore and Tuticorin by ships. From Ennore Port the coal is transported again through rail to Ennore Thermal Power Station and Mettur Thermal Power Station.BGR Energy Systems Ltd was the EPC contractor for 600 MW unit 5 of the power plant.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Tagged Pages: ennore thermal power plant inplant training, mettur thermal power station inplant training, mettur power plant impant training procedure, ennore power themal inplant training procedure, what is the procedure to attend the inplant training in mettur thermal power station, implant training in mettur thermal power plant, apply ipt in ennore thermal power plant inplant training,
Popular Searches: implant training in mettur thermal power plant, inplant training report in thermal power plant related to mba, mettur dam construction details ppt download, thermal power plant training seminar pdf, construction of thermal power plant civil engineering training report pdf, training report on kota thermal power plant, indian railway inplant training procedure,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  power plant instrumentation by krishnaswamy pdf free download 3 23,779 10-02-2019, 07:00 PM
Last Post:
  jobs in kanti thermal power plant muzaffarpur 3 8,703 17-01-2018, 01:14 PM
Last Post: [email protected]
  when are the application for lilitha nursing training 2016 1 7,432 07-04-2017, 12:40 PM
Last Post: jaseela123d
  when are the application for lilitha nursing training 2016 1 895 27-03-2017, 10:49 AM
Last Post: jaseela123d
  shanzu teachers training college fee structure 3 1,232 28-02-2017, 09:29 AM
Last Post: jaseela123d
  lilitha nursing training college 2017 intake 6 1,692 24-02-2017, 12:11 PM
Last Post: jaseela123d
  seminar topics in plant science and biotechnology 3 1,580 14-02-2017, 11:03 AM
Last Post: ijasti
  dlw summer training application form 2016 17 5 2,027 10-02-2017, 04:41 PM
Last Post: Arun Kumar yadav
  lilitha nursing training college 2017 intake 4 1,621 27-11-2016, 10:54 PM
Last Post: phelokazi khwele
  lilitha nursing training college 2017 intake 4 1,385 14-10-2016, 05:01 PM
Last Post: masbulele

Forum Jump: