ppt of pwd building construction
#1

respected sir,

                        I request you to tell me how to prepare a best PPT. report on building construction and what point will include.
                             Thank you
Reply
#2

The Central Department of Public Works of India, commonly known as the CPWD, is a central government authority in charge of public sector works. The Central Department of Public Works, under the Ministry of Urban Development, builds and maintains public buildings. CPWD was born in July 1854 when Lord Dalhousie established a central agency for the execution of public works and set up the Provincial Division of Ajmer. It has now become a comprehensive construction management department, which provides services from project concept to completion and maintenance management.


It is headed by the Director-General (DG), who is also the Chief Technical Adviser to the Government of India. The current DG is Mr Abhai Sinha. The regions and subregions are headed by the special DGs and the additional DGs, respectively, while the areas of all state capitals (except some) are headed by chief engineers. Now A Days, a new Project Manager (CPM) position has been created to lead the most prestigious CPWD projects. CPMs are equivalent to the rank of chief engineer in CPWD. With presence all over the country, CPWD's strength is its ability to undertake the construction of Complex Projects even in difficult terrain and post-construction maintenance.

It is the major engineering department of the Union Government of India and its specifications and manuals are followed by the local public works departments and engineering wing of other departments.

CPWD consists of three wings in the execution field:

1) B & R (Buildings and Roads)

2) E & M (electrical and mechanical)

3) Horticlture

There are three tables in CPWD:

1) CAS (Central Architecture Services)

2) CES (Central Engineering Services) - for civil engineers

3) CEMES (Central Electrical and Mechanical Engineering Services) -for Mechanical and Electrical Engineers

These are the Group A Civil Services. (List All Civil Servants of Group A: Civilian Services of India)

Recruitment as entry level for middle management is done through the Architecture Services Examination and the Engineering Services Examination conducted by the Union Public Service Commission. Only the best candidates in ESE have the opportunity to join the CPWD strictly on the basis of merit. During the trial period, selected candidates undergo rigorous 35-week training at the CPWD National Academy located in Ghaziabad (U.P). That makes them competent architects / engineers with bureaucrats. During the normal progress of the career one climbs the architect / chief engineer, then to the additional general manager and beyond to the special director general. There is a post of Director General, CPWD, who also acts as technical adviser to the Government of India.

Work on CPWD is challenging but rewarding. With the presence of Pan India, CPWD has been involved in building strategically important megaprojects across the country including border areas. CPWD is well known for building quality and timely completion of projects after it has large list of successful projects and departments as well as the clients it has served.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: ppt on vertical communication building construction, training report building in pdf by pwd, pdfs on training report on finishing in building pwd, ppt s on construction of multi stored building, demodulator ppt and pwd, ppt of pwd building construction, ppt of centering in building construction,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  Pwd training report 0 1,891 23-11-2018, 12:40 AM
Last Post:
  pwd summer training for mechanical 0 1,991 02-11-2018, 01:06 PM
Last Post: Guest
  ppt for underwater construction 2 885 05-10-2018, 06:31 PM
Last Post: sohailshaik868
  rule 27 of kerala panchayat building rules 2011 0 436 24-09-2018, 10:38 PM
Last Post: Guest
  kerala panchayat building rules malayalam pdf free download 0 661 23-09-2018, 01:39 PM
Last Post: Guest
  pwd summer training report civil engineering pdf download 0 655 27-07-2018, 04:26 PM
Last Post: Guest
  6th sem civil vtu alternative building materials and technologies notes download pdf 0 727 19-07-2018, 04:20 PM
Last Post: Guest
  kerala panchayat building rules 2016 malayalam pdf 0 663 12-07-2018, 10:14 AM
Last Post: Guest
  seminar report on use of plastic waste in road construction 0 1,033 10-07-2018, 04:09 PM
Last Post: Guest
  use of recovered tyres in construction ppt 0 574 01-07-2018, 06:44 PM
Last Post: Guest

Forum Jump: