Outsourcing and Capacity planning in an uncertain global environment
#1

submitted by:
Arjyajyoti Goswami
Rachna Chawla

[attachment=8943]
Outsourcing and Capacity planning in an uncertain global environment
DECISION : to select between a domestic supplier and an offshore supplier to fulfill a certain demand and also to determine the optimum capacity sizes
DECISION MAKER : a firm , which is single expected utility maximiser
DECISION MAKING STAGES:
Stage 1 – determining the capacity sizes to be reserved with the two firms
Stage 2 – determining the production quantities with the 2 firms
Need for the decision
The domestic supplier has much higher production cost than the offshore supplier, but it does not involve any risk of fluctuating exchange rates
The overseas supplier has much less production cost than the domestic supplier but involves risks of fluctuating exchange rates
Also it has been proved that if a firm secures order from two suppliers rather than one in a global environment, then the profit incurred is higher than securing the order from a single supplier
ASSUMPTIONS WHILE MODELLING THE PROBLEM
Supplier capacity is not an issue, and both the suppliers are capable of supplying the desired quantity of items to the firm
The capacity reservation cost is in direct proportion to the quantity of the goods reserved i.e capacity size
The unit capacity reservation cost for both the suppliers, is same in domestic currency
In the solution of the model capacity investment expansion is not considered, and focus is only in fulfilling the current demand rather than thinking of long term strategies
MODEL FOR STAGE 1:
Max U (K) = E [ π ( K;x,y)] – γ/2 Var [π ( K;x,y)],
π ( K;x,y) = πT (K;x,y) – (cK 1) T K
The objective function is a mean variance utility function of π i.e the net profit over two stages.
The second equation indicates that the net profit over 2 stages is equal to the sales profit in stage 2 minus the capacity reservation cost in stage 1, and it
If γ = 0 , the firm is risk neutral
If γ > 0 , the firm is risk averse
MODEL FOR STAGE 2
In the second stage when the exchange rate and demand are realized as (x,y) the firm makes production decisions of q1(<= K1) and q2(<= K1), respectively with the two suppliers
Max πT = qT ( p1 – c.[1,x]T)
Subject to, 0<= q<= K
1Tq<= y
Objective function is to maximize the profit, which is selling price minus the production cost
The first constraint signifies that the production quantity should be less than the reserved capacities and the second constraint signifies that the total production must not exceed the realized demand
Also, p – c1 > cK , so that the domestic supplier is not ruled out of consideration
Risk-neutral newsvendors
Deterministic Demand
Uncertain Demand

DETERMINISTIC DEMAND
We divide the capacity space in 5 regions, because if K is located in different regions, the corresponding shadow prices will be different
λ1, λ2 are the shadow prices associated with K1 and K2.
Whenever the λ1 >= λ2 the off shore supplier is preferred
Whenever λ2 >=λ1 the domestic supplier is preferred.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: supplier, domestic and global business environment for seminar ppt, embedded projects outsourcing, highest global environment challenge today, it project planning and implementation, componentry supplier, outsourcing firm merged xerox 2010,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  NC and CNC machines and Control Programming project report helper 1 3,228 12-05-2018, 10:11 AM
Last Post: Guest
  robots in radioactive environment full report project report tiger 10 12,265 20-02-2012, 03:32 PM
Last Post: seminar paper
  Enhance Identification And Removal of Threats By Misbehaving Nodes And Optimizing seminar class 0 712 12-04-2011, 11:13 AM
Last Post: seminar class
  Transportation model for aggregate planning project report helper 0 1,783 26-10-2010, 04:31 PM
Last Post: project report helper
  The Study and Application of Integrating Axiomatic Design and TRIZ for Conceptual Des project report helper 0 1,122 13-10-2010, 11:19 AM
Last Post: project report helper
  Magnetic Coupling Between DC Tachometer and Motor And Its Effect On Motion Control project topics 0 1,833 20-04-2010, 03:28 PM
Last Post: project topics
  Design and Control of Precise Robots with Active and Passive Kinematic Pairs project topics 0 1,388 20-04-2010, 03:27 PM
Last Post: project topics
  IMPLEMENTATION OF AUTOMATED MANUFACTURING PROCESS PLANNING IN ENGINEERING DESIGN seminar topics 0 2,200 22-03-2010, 10:44 PM
Last Post: seminar topics
  Computer Aided Process Planning CAPP mechanical engineering 0 6,089 28-12-2009, 04:55 PM
Last Post: mechanical engineering
  Driving and the Built Environment: The Effects of Compact Development on Motorized Tr Electrical Fan 0 1,153 03-09-2009, 04:43 AM
Last Post: Electrical Fan

Forum Jump: