Operation and Control of Single Phase Micro- Sources in a Utility Connected Grid
#3

AUTOMATION IN POWER DISTRIBUTION
The demand for electrical energy is ever increasing. Today over 21% (theft apart!!) of the total electrical energy generated in India is lost in transmission (4-6%) and distribution (15-18%). The electrical power deficit in the country is currently about 18%. Clearly, reduction in distribution losses can reduce this deficit significantly. It is possible to bring down the distribution losses to a 6-8 % level in India with the help of newer technological options (including information technology) in the electrical power distribution sector which will enable better monitoring and control.
How does Power reach us?
Electric power is normally generated at 11-25kV in a power station. To transmit over long distances, it is then stepped-up to 400kV, 220kV or 132kV as necessary. Power is carried through a transmission network of high voltage lines. Usually, these lines run into hundreds of kilometres and deliver the power into a common power pool called the grid. The grid is connected to load centres (cities) through a sub-transmission network of normally 33kV (or sometimes 66kV) lines. These lines terminate into a 33kV (or 66kV) substation, where the voltage is stepped-down to 11kV for power distribution to load points through a distribution network of lines at 11kV and lower.
The power network, which generally concerns the common man, is the distribution network of 11kV lines or feeders downstream of the 33kV substation. Each 11kV feeder which emanates from the 33kV substation branches further into several subsidiary 11kV feeders to carry power close to the load points (localities, industrial areas, villages, etc.,). At these load points, a transformer further reduces the voltage from 11kV to 415V to provide the last-mile connection through 415V feeders (also called as Low Tension (LT) feeders) to individual customers, either at 240V (as single-phase supply) or at 415V (as three-phase supply). A feeder could be either an overhead line or an underground cable. In urban areas, owing to the density of customers, the length of an 11kV feeder is generally up to 3 km. On the other hand, in rural areas, the feeder length is much larger (up to 20 km). A 415V feeder should normally be restricted to about 0.5-1.0 km. Unduly long feeders lead to low voltage at the consumer end.

Bottlenecks in Ensuring Reliable Power
Lack of information at the base station (33kV sub-station) on the loading and health status of the 11kV/415V transformer and associated feeders is one primary cause of inefficient power distribution. Due to absence of monitoring, overloading occurs, which results in low voltage at the customer end and increases the risk of frequent breakdowns of transformers and feeders. In fact, the transformer breakdown rate in India is as high as around 20%, in contrast to less than 2% in some advanced countries.
In the absence of switches at different points in the distribution network, it is not possible to isolate certain loads for load shedding as and when required. The only option available in the present distribution network is the circuit breaker (one each for every main 11kV feeder) at the 33kV substation. However, these circuit breakers are actually provided as a means of protection to completely isolate the downstream network in the event of a fault. Using this as a tool for load management is not desirable, as it disconnects the power supply to a very large segment of consumers. Clearly, there is a need to put in place a system that can achieve a finer resolution in load management.
In the event of a fault on any feeder section downstream, the circuit breaker at the 33kV substation trips (opens). As a result, there is a blackout over a large section of the distribution network. If the faulty feeder segment could be precisely identified, it would be possible to substantially reduce the blackout area, by re-routing the power to the healthy feeder segments through the operation of switches (of the same type as those for load management) placed at strategic locations in various feeder segments.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: operation and control of microsources connected in a utility grid project report, micro grid autonomous operation during subsequent to islanding process, power management strategies of micro grid simulink diagram file exchange, grid connected pv systems, transformerless grid connected pv, power system operation and control ppt lecture pdf, microcontroller connected to uartppt,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Messages In This Thread
RE: Operation and Control of Single Phase Micro- Sources in a Utility Connected Grid - by project uploader - 07-01-2012, 05:25 PM

Possibly Related Threads...
Thread Author Replies Views Last Post
  A SEMINAR REPORT on GRID COMPUTING Computer Science Clay 5 16,422 09-03-2015, 04:48 PM
Last Post: iyjwtfxgj
  Control of Boiler Operation using PLC – SCADA seminar class 2 3,482 27-03-2014, 06:29 AM
Last Post: Guest
  SCADA Supervisory Control and Data Acquisition iitbuji 8 7,835 17-12-2012, 12:58 AM
Last Post: Guest
  A survey of usage of Data Mining and Data Warehousing in Academic Institution and Lib seminar class 1 2,201 29-11-2012, 12:56 PM
Last Post: seminar details
  Integrated Design and Implementation of Embedded Control Systems with Scilab seminar surveyer 1 2,434 19-10-2012, 01:58 PM
Last Post: seminar details
Photo GRID COMPUTING computer science crazy 1 2,840 03-10-2012, 12:23 PM
Last Post: seminar details
  SECURITY ISSUES IN GRID COMPUTING seminar projects crazy 1 2,401 03-10-2012, 12:23 PM
Last Post: seminar details
  Intelligent Electronic Devices (IEDs) and Supervisory Control and Data Acquisition computer girl 0 1,206 09-06-2012, 06:01 PM
Last Post: computer girl
  SEMINAR ON PLC OPERATION computer girl 0 849 09-06-2012, 12:12 PM
Last Post: computer girl
  Access control computer girl 0 748 05-06-2012, 12:07 PM
Last Post: computer girl

Forum Jump: