NUCLEAR REACTOR
#1

[attachment=11722]
Workings of a Nuclear Reactor
• Reactor Basics
• PWR
• BWR
Key Reactor Power Terms
• Availability – Fraction of time over a reporting period that the plant is operational
– If a reactor is down for maintenance 1 week and refueling 2 weeks every year, the availability factor of the reactor would be
(365-3 * 7) / 365 = 0.94
Key Reactor Power Terms
• Capacity – Fraction of total electric power that could be produced
– If reactor with a maximum thermal power rating of 1000 MWt only operates at 900 MWt, the capacity factor would be 0.90
• Efficiency – Electrical energy output per thermal energy output of the reactor
Eff=W/QR (MWe/MWt)
Term Visualization
Piecing Together a Reactor
1. Fuel
2. Moderator
3. Control Rods
4. Coolant
5. Steam Generator
6. Turbine/Generator
7. Pumps
8. Heat Exchanger
Basic Reactor Model
• Nuclear Power in the United States
• ~20% Nuclear Energy
• 103 Nuclear Reactors
– 31 States
– 34 BWRs
– 69 PWRs
• Largest Plant
– Palo Verde
– 3825 MWe/3 reactors
– 12th Largest in World
Nuclear Power in the United States
• Manufacturers
– General Electric
• ge.com
– Westinghouse
• westinghouse.com
– AREVA NP
• framatome-anp.com
– ABB Combustion Eng.
• abb.com
• World Nuclear Power
• 443 Nuclear Reactors in 30 Countries in Operation, January 2006
• Provided ~16% World Production of Energy in 2003
• 24 Nuclear Power Plants under Construction
• Reactor Generations
• Gen I
– Prototypes in 50’s & 60’s
• Gen II
– 70’s & 80’s
– Today’s Operational Reactors
– BWR, PWR, CANDU, …
• Gen III
– ABWR, APWR
– Approved 90’s
– Some Built around the World
• Gen III+
– Current Advanced Designs in the Approval Process
– Pebble Bed Reactor
• Gen IV
– Deploy in 2030
– Economical
– Safe
– Minimize Waste
– Reduce Proliferation
• Reactor Generations
• Pressurized Water Reactor (PWR)
• Pressure Vessel
• Light Water
• 3.2% U-235 Fuel
• 2-4 Loops => Steam
• UO2 Pellets in Zircaloy
• 17 x 17 array
• 12 foot long bundle
• ~32% Efficiency
• External Pipe Corrosion
• Lower Capital Cost
• AP600 Westinghouse
• 600 MWe
• Passive Safety Cooling Systems
• Prefabricated and Assembled On-Site
• Simple Plant Design = Reduced Volume and Cost
• 3-year
Construction
• Basic Diagram of a PWR
• A PWR in Practice
• VVER – Russian PWR (Water-Cooled, Water-Moderated, Energy Reactor)
• Other LWR Reactors
• Republic of Korea
– Optimized Power Reactor, OPR-1000
– Advanced Power Reactor, APR-1400
– System-integrated Modular Advanced Reactor, SMART (330 MWt)
• Germany
– KONVOI, 1300 MW
• France
– N4, 1450 MW
• AREVA NP – EPR (European Pressurized-Water Reactor)
• 1600 MWe
• 36 – 37% Efficiency
• Mixed Oxide (MOX) Fuel
• 60 – yr Service Life
• 3 – 4 yr Construction
• Multiple Barriers and Simple Safety Systems
• Westinghouse – AP1000 Reactor
• 1117 – 1154 MWe
• Improved AP600 Design
– Same Basic Design
– Same Inherent Safety
– Optimized Power Output
– Reduced Energy Costs
• 2 Steam Generators
• 3 year Construction
• Final Design Approval in December 2005!
• AP1000 – Less Pieces
• Boiling Water Reactor (BWR)
• Direct Boiling
• 10% Coolant = Steam
• Similar Fuel to PWR
• Lower Power Density than PWR
• Corrosion Product Activated in Core
Higher Radiation Field
• GE – ABWR
• 1350 MWe
(3926 MWt)
• UO2 Fuel
• 60 – yr Service Life
• Internalized Safety and Recirculation Systems
Basic Diagram of a BWR
• A BWR in Practice
• ABWR (Advanced Boiling Water Reactor)
• 1350 MWe
• 77% more compact than BWR design
• 39 month construction period
• ABWR – Less Pieces
• ABWR-II
• Early 1990s - TEPCO, 5 other utilities, GE, Hitachi and Toshiba began development
• 1700 MWe
• Goals
– 30% capital cost reduction
– reduced construction time
– 20% power generation cost reduction
– increased safety
– increased flexibility for future fuel cycles
• Commercialize – latter 2010s
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: nuclear reactor physics, abstract of magnox nuclear reactor, nuclear reactor pdf, nuclear reactor shielding, nuclear reactor diagram, nuclear reactor seminar ppt, nuclear arc reactor ppt,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  Nuclear micro-battery Electrical Fan 7 8,499 09-07-2011, 09:48 AM
Last Post: seminar addict
  Nuclear Training Center Rajasthan Atomic Power Plant Rawatbhata seminar class 0 3,546 18-03-2011, 03:48 PM
Last Post: seminar class
  Pebble-Bed Reactor project topics 0 1,859 03-04-2010, 07:43 PM
Last Post: project topics
  thorium reactor full report project report tiger 0 1,715 21-02-2010, 08:26 AM
Last Post: project report tiger
  Floating nuclear power stations computer science crazy 0 1,603 27-08-2009, 12:51 PM
Last Post: computer science crazy

Forum Jump: