ntpc korba vocational training
#1

I am interested in vocational training in ntpc korba .So, please send me details &form and criteria
Name Umakant thakur
Mob no 9039596149
Email I'd ut3987664[at]gmail.com
And my friend in group members are 3 student are join name are shirsti Dubey and Akash Mishra and Shweta Paswan   all students are pursuing in 7 sem sir . Plz sir
Reply
#2

NTPC is the largest energy conglomerate in India with roots planted in 1975 to accelerate energy development in India. Since then, it has established itself as the dominant dominant power with presence throughout the value chain of the power generation business. Of the fossil fuels has penetrated in the generation of electricity through the sources of hydropower, nuclear and renewable. This incursion will play an important role in reducing its carbon footprint by reducing greenhouse gas emissions. To strengthen its core business, the corporation has diversified in the fields of consulting, energy trading, energy professional training, rural electrification, ash utilization and coal mining as well. NTPC became a Maharatna company in May 2010, one of the only four companies that achieved this status. NTPC ranked 400th in the 2016 ranking, Forbes Global 2000 of the world's largest companies.


The company's total installed capacity is 51,410 MW (including JVs) with 20 coal-based stations, 7 gas-based stations, a Hydro-based station and a Wind-based station. 9 Joint Venture stations are based on coal and 10 solar photovoltaic projects. The capacity will have a diversified fuel mix and by 2032, non-fossil fuel generation capacity will account for almost 30% of the NTPC portfolio. NTPC has been operating its plants with high levels of efficiency. Although the company has 17.73% of the total national capacity, it contributes 24% of the total power generation due to its focus on high efficiency.

In October 2004, NTPC launched its initial public offering (IPO), which consists of 5.25% as a new issue and 5.25% as an offer for sale by the Government of India. NTPC became a listed company in November 2004 with the Government holding 89.5% of the share capital. In February 2010, the Government's share of India was reduced from 89.5% to 84.5% through a new public offering. The Government of India has again evicted 9.5% of the shares through the OFS route in February 2013. With this, GOI's participation in NTPC has been reduced from 84.5% to 75%. The rest is in charge of Institutional Investors, banks and Public.

NTPC is not only the first power generator; It is also one of the great places to work. The company is guided by the mantra "People before Plant Load Factor" which is the template for all its policies related to human resources. NTPC has been ranked as "the 6th best company to work for in India" between public sector commitments and large companies by 2014, by the Institute of Places to Work, chapter of India in collaboration with the times Economic benefits.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: tellphone direactory of ntpc korba, ntpc korba vocational training 2013 certificate, vocational training in ntpc, vocational training in ntpc korba, internship in ntpc korba, a project report on vocational training at ntpc barh, ntpc korba project report vocational pdf,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  vocational training report 0 651 18-11-2020, 03:08 PM
Last Post:
  Summer training pdf 0 1,305 29-02-2020, 05:48 PM
Last Post:
  Graduate engineering training 0 1,869 29-12-2018, 06:38 PM
Last Post:
  Pwd training report 0 1,901 23-11-2018, 12:40 AM
Last Post:
  pwd summer training for mechanical 0 2,003 02-11-2018, 01:06 PM
Last Post: Guest
  industrial training report on 132 33 11 k v substation 0 8,663 29-10-2018, 12:20 PM
Last Post: Guest
  indian railway summer training report for ee 0 1,843 23-10-2018, 02:37 PM
Last Post: Guest
  irrigation summer training report for civil engineer in pdf 3 3,286 07-10-2018, 02:00 PM
Last Post: [email protected]
  dsp winter training application form durgapur 0 1,444 01-10-2018, 04:43 PM
Last Post: Guest
  summer training report gorakhpur railway 0 1,409 29-09-2018, 03:11 PM
Last Post: Guest

Forum Jump: