nhpc banbasa summer training report pdf
#1

Provide me d summer training report on NHPC
Reply
#2

As of now NHPC Limited has become the largest organization for the development of hydroelectric power in India, with capabilities to carry out all activities from the conceptualization to the start-up in relation to the creation of hydroelectric projects. NHPC Limited also plans to carry out wind and tidal energy projects in the country.

NHPC Limited currently has a 6667 MW installation base of 21 hydropower stations per property, including the projects included in Joint Venture. Taking into account the obstacles faced during the execution of these projects, such as unfavourable geological conditions, difficult problems of public order, inaccessible and remote places, the achievement so far is commendable. The generation performance of these stations has been outstanding.

NHPC Limited is currently participating in the construction of 3 projects that will be added to a total installed capacity of 3130 MW. Given the renewed momentum in the development of hydropower in the country, NHPC Limited has drawn up an ambitious plan to add approximately 6,000 MW of hydroelectric capacity by the end of the year 2022.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Tagged Pages: npc banbasa training report, nhpc banbasa training report, nhpc banbasa report,
Popular Searches: summer report in nhpc, ppt nhpc, ppt on nhpc, ppt on nhpc summer training, nhpc banbasa report pdf, training for civil nhpc, summer training in nhpc,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  Summer internship in verka milk plant, Amritsar 0 1,482 21-02-2023, 02:07 PM
Last Post:
  Summer internship in verka milk plant , Amritsar. 0 1,437 21-02-2023, 02:05 PM
Last Post:
  vocational training report 0 640 18-11-2020, 03:08 PM
Last Post:
  Report in PDF format 0 7,310 18-05-2020, 11:28 AM
Last Post:
  Summer training pdf 0 1,294 29-02-2020, 05:48 PM
Last Post:
  Graduate engineering training 0 1,857 29-12-2018, 06:38 PM
Last Post:
  Pwd training report 0 1,891 23-11-2018, 12:40 AM
Last Post:
  pwd summer training for mechanical 0 1,990 02-11-2018, 01:06 PM
Last Post: Guest
  industrial training report on 132 33 11 k v substation 0 8,562 29-10-2018, 12:20 PM
Last Post: Guest
  indian railway summer training report for ee 0 1,835 23-10-2018, 02:37 PM
Last Post: Guest

Forum Jump: