MODULAR FIXTURE : FIXTURING IN MORDEN ERA OF MANUFACTURING full report
#1

[attachment=4235]
SUBMITTED BY:

(ASEEM KUMAR SINGH)
ROLL NO
09306EN030
Production Engg.

APPROVED BY:

(Dr SANTOSH KUMAR)
Prof. Mech Engg Dept.


MODULAR FIXTURE : FIXTURING IN MORDEN ERA OF MANUFACTURING


Abstract-

Modular Fixturing components are designed to be versatile and interchangeable to a number of different industrial applications. They provide quick application changeover without sacrificing accuracy when holding a work piece in place. Unlike dedicated fixturing, a modular workholding system is comprised of many interchangeable components that allow flexibility when designing custom fixtures from one application to the next. The modular system can be used with other modular fixturing devices or independently with existing tooling to immediately increase productivity while reducing setup times and fixture costs. It is most often used in automated manufacturing environment.

Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: ppt for jigs fixture, modular fixture components, new era university philippines inq7, modular fixture tables, ppt of jig and fixture, seminar topics for ece students by source era, gang milling fixture in pdf,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  NanoTechnology (Download Full Seminar Report) Computer Science Clay 39 57,241 16-08-2018, 01:41 PM
Last Post: pradeepkumar.M
  magnetic refrigeration full report project report tiger 46 45,859 20-06-2018, 11:43 PM
Last Post: Guest
  MANUFACTURING PROCESS OF CAST-RESIN TRANSFORMERS seminar class 2 9,642 15-01-2018, 03:28 PM
Last Post: dhanabhagya
  TQM Total quality management full report project report tiger 5 14,168 18-09-2016, 08:41 PM
Last Post: velraj
  thermoacoustic refrigeration full report project report tiger 12 19,985 06-03-2015, 06:28 PM
Last Post: Guest
  the gurney flap full report project report tiger 1 3,621 04-12-2014, 02:02 PM
Last Post: pricemuzDet
  exhaust gas recirculation full report project report tiger 8 10,922 05-11-2014, 09:06 PM
Last Post: jaseela123d
  IMPROVEMENT OF THERMAL EFFICIENCY BY RECOVERY OF HEAT FROM IC ENGINE EXHAUST full rep project report tiger 7 8,618 18-10-2014, 10:35 PM
Last Post: jaseela123d
  reverse engineering full report project report tiger 3 6,531 11-10-2014, 10:49 PM
Last Post: Guest
  sensotronic brake control full report computer science technology 13 24,206 07-10-2014, 10:01 PM
Last Post: seminar report asees

Forum Jump: