Modern GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS
#1

presented by:
ARCHANA MALLICK

[attachment=9224]
Modern GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS
INTRODUCTION

 Transportation contributes to the economic,industrial,social and cultural development of any country.
 Transportation by road or highways is the only mode which could give maximum service to one and all.
 When the soil on a project site cannot support the loads, ground improvement to increase strength, reduce compressibility, and enhance performance under applied loadings may be required.
 The field of ground improvement techniques has been recognized as an important and rapidly expanding one.
 Various methods are discussed below:
METHODS FOR GROUND IMPROVEMENT
1. VERTICAL DRAINS
2. SOIL NAILING
3. STONE COLUMNS
4. VIBRO COMPACTION
5. DYNAMIC COMPACTION
6. VIBRO PIERS
VERTICAL DRAINS
 These consist of a column of pervious material placed in cylindrical vertical holes at sufficiently close spaces.
 All drains should be connected at the ground surface to a drainage blanket.
 Vertical drains accelerate consolidation by facilitating drainage of pore water.
 Vertical drains are laid out in rows, staggered, or aligned to form patterns of equilateral triangles or squares.
 Two types of drains are discussed below
SAND DRAINS
• A sand drain is a simple process, employing a column of at least 10 inches in width augered into ground to be surcharged and consolidated.
• The column is then filled with sand and connected to a free-draining blanket of granular soil.
WICK DRAINS
• A wick drain is usually about, 4 inches wide, 1/8-inch thick which acts as a high-permeability conduit for water to flow out of the soil and to the surface.
• Most common application of wick drains is for accelerating the settlement rate of compressible soils.
SOIL NAILING
 This ground reinforcement process uses steel tendons which are drilled and grouted into the soil to create a composite mass.
 A shotcrete facing is typically applied.
 Soil Nailing is an in situ technique for reinforcing, stabilizing and retaining excavations and deep cuts.
 Soil nailing is not practical in:
1. Soft, plastic clays
2. Organics/Peat
3. Fills (rubble, cinder, ash, etc.)
STONE COLUMNS
• Also known as vibro-replacement or vibro-displacement, is a ground improvement process where vertical columns of compacted aggregate are formed through the soils to be improved.
• The vibrator first penetrates to the required depth by vibration and air or water jetting or by vibration alone.
• Gravel is then added at the tip of the vibrator and progressive raising and repenetration of the vibrator results in the gravel being pushed into the surrounding soil.
• The soil-column matrix results in an overall mass having a high shear strength and a low compressibility.
VIBRO COMPACTION
 It is a ground improvement process for densifying loose sands to create stable foundation soils.
 The action of the vibrator, usually accompanied by water jetting, reduces the inter-granular forces between the soil particles, allowing them to move into a denser configuration, typically achieving a relative density of 70 to 85 percent.
 Compaction is achieved above and below the water table.
Reply
#2
please give me a precast related seminar topics.
Reply
#3
please send the full report
Reply
#4

hi friend you can refer these pages to get the details on Modern GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS

http://studentbank.in/report-ground-impr...ull-report

http://seminarsprojects.in/attachment.php?aid=9224
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: ppt of ground improvement techniques by grouting, highways, types of ground improvement techniques, ground improvement techniques pdf report, seminar ground improvement pdf file, kormosansthan this wick, full report on ground improvement techniques for highway,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  New Techniques Of Erosion Control On Hill Roads computer science crazy 7 10,797 16-03-2018, 07:11 PM
Last Post: Guest
  RAINWATER HARVESTING AND ARTIFICIAL RECHARGE TO GROUND WATER full report project report tiger 11 11,770 17-12-2015, 02:13 PM
Last Post: seminar report asees
  New Techniques Of Waste Water Management computer science crazy 9 16,435 18-08-2014, 05:44 AM
Last Post: Guest
Thumbs Up Ground Water POLLUTION computer science crazy 2 7,719 11-12-2012, 03:40 PM
Last Post: seminar details
  ground improvement technique [email protected] 2 4,384 10-11-2012, 12:59 PM
Last Post: seminar details
  GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS full report project report tiger 7 16,438 10-11-2012, 12:59 PM
Last Post: seminar details
  New Techniques Of Erosion Control On Hill Roads Electrical Fan 6 5,559 09-01-2012, 09:30 AM
Last Post: seminar addict
  NEW TECHNIQUES OF EROSION CONTROLS ON HILL ROADS full report project report tiger 7 23,361 14-07-2011, 08:21 PM
Last Post: chottuabhijith
  Evaluation of Techniques for Modeling the Event-Based Rainfall-Runoff Process seminar class 0 2,050 07-05-2011, 11:15 AM
Last Post: seminar class
  GROUND IMPROVEMENT TECHNIQUES full report seminar class 0 4,198 28-04-2011, 02:48 PM
Last Post: seminar class

Forum Jump: