ABSTRACT
Power quality is one of major concerns in the present era. It has become important, especially, with the introduction of sophisticated devices, whose performance is very sensitive to the quality of power supply that results in a failure of end use equipments. One of the major problems dealt here is the voltage sag.
To solve this problem, custom power devices are used. One of those devices is the Dynamic Voltage Restorer (DVR), which is the most efficient and effective modern custom power device used in power distribution networks. Its appeal includes lower cost, smaller size, and its fast dynamic response to the disturbance. It can provide the most commercial solution to mitigation voltage sag by injecting voltage as well as power into the system. This paper presents modeling, analysis and simulation of a Dynamic Voltage Restorer (DVR) using MATLAB. The efficiency of the DVR depends on the performance of the efficiency control technique involved in switching the inverters. In this model a PI controller and Discrete PWM pulse generator was used.
1.INTRODUCTION
Modern electric power systems are complex networks with hundreds of generating stations and thousands of load centers are interconnected through long power transmission and distribution networks. Power quality is major concern in industries today because of enormous losses in energy and money. With the advent of myriad sophisticated electrical and electronic equipment, such as computers, programmable logic controllers and variable speed drives which are very sensitive to disturbances and non-linear loads at distribution systems produces many power quality problems like voltage sags, swells and harmonics and the purity of sine waveform is lost. Voltage sags are considered to be one of the most severe disturbances to the industrial equipments.
Power quality problems are associated with an extensive number of electromagnetic phenomena in power systems with broad ranges of time frames such as long duration variations, short duration variations and other disturbances. Short duration variations are mainly caused by either fault conditions or energization of large loads that require high starting currents. Depending on the electrical distance related to impedance type of grounding and connection o f transformers between the faulted/load location and the node, there can be a temporary loss of voltage or temporary voltage reduction (sag) or voltage rise (swell) at different nodes of the system.
Power distribution systems, ideally, should provide their customer with an uninterrupted power flow at smooth sinusoidal voltage at the contracted magnitude level and frequency .A momentary disturbance for sensitive electronic devices causes voltage reduction at load end leading to frequency deviations which results in interrupted power flow, scrambled data, unexpected plant shutdowns and equipment failure. Voltage lift up at a load can be achieved by reactive power injection at the load point of common coupling (PCC). The common method for this is to install mechanically switched shunt capacitors in the primary terminal of the distribution transformer. The mechanical switching may be on a schedule, via signals from a supervisory control and data acquisition (SCADA) system, with some timing schedule, or with no switching at all. The disadvantage is that, high speed transients
cannot be compensated. Some sag is not corrected within the limited time frame of
mechanical switching devices. Transformer taps may be used, but tap changing under load is costly.
Another power electronic solution to the voltage regulation is the use of a dynamic voltage restorer (DVR). DVR’s are a class of custom power devices for providing reliable distribution power quality. They employ a series of voltage boost technology using solid state switches for compensating voltage sags/swells. The DVR applications are mainly for sensitive loads that may be drastically affected by fluctuations in system voltage.
Reply
#2

For More IEEE project on Network Simulation, view...

http://studentbank.in/report-ieee-projec...simulation
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: matlab simulink model for dynamic voltage restorer dvr, of dynamic voltage restorer advantages and disadvantages, what is autocop dvr software, car dvr system, ppt of voltage quality improvement usin dvr, mdl file for dynamic voltage restorer, ppt dynamic voltage restorer,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  MEASUREMENT OF VOLTAGE USING DIGITAL VOLTMETER WITH ICL7107 seminar class 1 4,832 22-06-2016, 01:11 PM
Last Post: seminar report asees
  Voltage Sag Analysis computer science crazy 3 5,570 03-03-2015, 01:29 PM
Last Post: Guest
  Modeling and Testing of a Digital Distance Relay Using MATLAB/SIMULINK smart paper boy 6 4,024 09-08-2013, 10:56 AM
Last Post: computer topic
  VOLTAGE STABILITY ANALYSIS UNDER NORMAL AND CONTINGENCY CONDITIONS science projects buddy 4 3,346 13-03-2013, 11:50 AM
Last Post: quarkhirad
  An Improved Nonlinear STATCOM Control for Electric Arc Furnace Voltage Flicker smart paper boy 1 1,808 14-12-2012, 02:19 PM
Last Post: seminar details
  STATCOM Analysis and Controller Design for Power System Voltage Regulation smart paper boy 1 1,258 14-12-2012, 02:19 PM
Last Post: seminar details
  PON Topologies for Dynamic Optical Access Networks smart paper boy 1 1,786 12-12-2012, 12:40 PM
Last Post: seminar details
  Simulation and Fault analysis of HVDC project report helper 1 2,636 08-12-2012, 04:43 PM
Last Post: seminar details
  Distributed cache updating for the Dynamic source routing protocol computer science crazy 1 1,350 01-12-2012, 01:35 PM
Last Post: seminar details
  over-under voltage cut-off with ON-Time delay PROJECT REPORT project topics 3 5,331 01-12-2012, 12:23 PM
Last Post: seminar details

Forum Jump: