mivan shuttering pdf
#1

hii

required MIVAn shuttering rate analysis.if u have please send to my mail

Reply
#2

Mivan is the name of the company that invented the "Aluminum Form-work". Therefore, it is often called mivan form of work as in India we call fresh drink as pepsi or coconut cola and toothpaste as colgate.
In the mivan work form we can mold the entire slab, beam, column at once making the unit a composite structure.
Bottom view of the mivan configuration;

[Image: main-qimg-47295e90601150cec40e4ccc7b4c1dda-p]

Uses of Mivan Formwork:

O 3S - Construction System - Speed, Strength, Safety
O It eliminates the construction of columns and beams
O The walls and slabs are melted in a single operation
O Specially designed, easy-to-handle lightweight aluminum pre-designed shapes
O Assembly and assembly of the part of the formwork
O Concrete wall and plate making

Advantage:

O Formwork Mivan requires a relatively
O More seismic resistance
O Greater durability
O Least joints and leakage reduction
O Highest carpet area
O Smooth finish of wall and slab
O Uniform quality of construction
Or insignificant maintenance
O Faster Termination

Limitations:

Although there are so many advantages of how Mivan-work limitations can not be ignored. However, the limitations pose no serious problem. They are the following:
O Due to the small sizes of small finishing lines seen on concrete surfaces
O Services after completion become a bit difficult due to the small width of the components
O Uniform planning is required as well as uniform elevations to be profitable
O Formwork requires number of spacer, wall loops etc that are placed @ 2 feet c / c; These cause problems such as leaks, leaks during the monsoon
O Due to box type construction, shrinkage cracks are likely to appear
O The heat of hydration is high due to the cutting walls
O It is of rigid design once placed, since any alteration becomes more difficult after
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Tagged Pages: mivan shuttering pdf, word document for mivan shuttering,
Popular Searches: disadvantages in mivan technology in construction, mivan formwork free journal paper, doca shuttering, mivan formwork checklist, mivan checklist pdf, mivan formwork video free download, power point presentation on mivan technology,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  slipform shuttering contractors 1 716 30-03-2017, 04:43 PM
Last Post: jaseela123d
  mivan shuttering formwork checklist pdf 1 1,565 24-03-2017, 04:30 PM
Last Post: jaseela123d
  mivan shuttering pdf 2 2,177 13-12-2014, 11:05 PM
Last Post: Guest
  aluform shuttering photoes 0 653 27-04-2013, 12:18 PM
Last Post: Guest
  ppt on scaffolding for shuttering 0 949 27-03-2013, 05:52 PM
Last Post: Guest
  pdf of intelligent car control and recognition embedded system pdf 0 1,082 25-01-2013, 10:53 PM
Last Post: Guest
  aakash tablet pdf download pdf file 0 1,416 13-01-2013, 11:42 PM
Last Post: Guest
Wink disadvantages of mivan shuttering 0 1,701 31-10-2012, 12:29 PM
Last Post: Guest
  pdf of full seminars report on light fidelity pdf 0 2,366 06-10-2012, 08:58 PM
Last Post: Guest
  robot circuit diagram of a war robot pdf mini robot project circuit diagram with pdf 0 3,058 06-08-2012, 08:45 AM
Last Post: Guest

Forum Jump: