09-10-2010, 12:14 PM
[attachment=5486]
LIST FOR MECHANICAL PROJECTS
LAST UPDATED -02-01-09
MATERIAL HANDLING
MOTORISED OBJECT LIFTING JACK : The object lifting Jack works with the help
of geared motors and worm gear arrangement to lift the objects. The modified version
can even lift car using the same principle.
KEY CONTROLLED- FORK LIFTER: - This Fork lifter lift the floor items and
place at the required space as instructed by Key controls.
MATERIAL HANDLING (X, Y, Z MOTION CONTROL): - A switch controlled
material handling mechanical assembly that can pick or place the goods in all three axis
using three gear motors.
STEPPER MOTOR CONTROL WITH SELECTED STEPS FOR CONVEYOR
BELT: -An automatic system that moves the stepper motor for bottle vending /material
dispenser control system.
OBJECT REJECTION & COUNTING MACHINE: - A conveyor belt based project
that carries goods of different height or material. The object rejection setup removes the
item from the moving belt if it does not fulfill the condition.
ROBOTIC ARM WITH GRIPPER: - A three-geared motor setup of robotic arm is an
interesting project under material handling. Six keys operation controls the whole setup
of the model.
NEUMATIC/HYDRAULIC ROBO ARM: The air pressure is the base behind this to
move the arm to grip, to lift and to rotate the material to handle. A mini compressor will
create the air pressure.
NEUMATIC/HYDRAULIC CRANE: The air pressure is the base behind this to move
the arm to pick and to lift the material handling crane. A mini compressor will create the
air pressure.