kpbr buiding setback 2015
#1

I have a Small plot 2.5cent how much I provide for front side. Road set back
Reply
#2

1) The minimum distance between the plot boundary abutting any street other than National Highways, State Highways, district roads and other roads notified by the Grama Panchayat and the building other than compound wall or fence or outdoor display structure, shall be 2 metres:
Provided that any restriction under street alignment or building line or both, if any fixed for the area and any development plan or any other rules or byelaws shall also apply simultaneously to all buildings in addition to the provisions contained in sub rule (1)
(2) The front yard shall be minimum 1.80 metres depth.
Provided that if 1.80 metres depth cannot be maintained laterally through out due to the peculiar shape of the plot, it shall suffice if the mean depth is not less than 1.80 metres with minimum depth at all points not less than 1.20 metres.
(3) Any one side shall have a minimum of 0.90 metre and other side shall have a minimum of 0.60 metre:
Provided that no opening other than ventilator above a height of 2.0 metres from the floor level shall be provided on the side having only 0.60 metre open space. However openings shall be allowed if open space is 0.90 metre. on that side also.
Provided further that the open space, on one side other than that having 0.90 metre width may be reduced; or the building can even abut the plot boundary without any manner of opening on that side, if the owner of the plot on that side voluntarily agree for the same in writing
(4) The rear side shall have an average depth of 1m., with minimum 0.50 metre
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Tagged Pages: judgement stetback kpbr,
Popular Searches: topics on robotics pptdownload kpbr 2014 malayalam pdf download, kpbr malayalam format, passive solar buiding file type ppt, metre brige, kpbr 2015 pdf, kpbr 2015 malayalam, evacuation plans in high rise buiding,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  7 8 2015 kerala lottery result 1 603 22-11-2017, 09:57 AM
Last Post: jaseela123d
  lenovo pondicherry inplant training dates in june 2015 1 485 14-11-2017, 01:34 PM
Last Post: jaseela123d
  ndt cut off z score 2015 2016 pdf 0 573 11-09-2017, 05:29 PM
Last Post: Guest
  kpbr rules 2016 pdf 1 653 15-07-2017, 03:16 PM
Last Post: jaseela123d
  mumbai university tybsc topper 2015 1 497 15-05-2017, 09:12 AM
Last Post: jaseela123d
  25 september 2015 bartaman patrika 1 515 13-05-2017, 02:43 PM
Last Post: jaseela123d
  kpbr building rool 2015 malayalam pdf 1 531 02-05-2017, 09:47 AM
Last Post: jaseela123d
  fees structure of kamwenja teachers college 2015 1 536 17-04-2017, 10:03 AM
Last Post: jaseela123d
  kpbr 2014 malayalam pdf download 1 842 12-04-2017, 12:46 PM
Last Post: Guest
  tybsc zoology question paper sem 6 2015-2016 1 676 10-04-2017, 03:46 PM
Last Post: jaseela123d

Forum Jump: