KESORAM CEMENT FACTORY LIMITED
#1

[attachment=15358]
ABOUT KESORAM CEMENT FACTORY LIMITED
Basic needs like food to live, cloth to wear and shelter to hide affect the common for people shelter is also necessary to protect the life from many natural calamities. There were number of charges of the process of constructing houses for the main material for the house construction.
In this modern age cement industry is ranked as a basic industry because for very development effort that is from the construction of single house hold to the building of big multipurpose dams, cement constitutes a basic ingredient it is used by the to have a strong and durable construction. They want a material, which is of strongly uniting masses cement when mixed with sound and water in a proper ratio is able to give these benefits to the user. The cement is of many types. They include ordinary Portland cements Portland strong cement, Portland pozzoland cement, white pot land cement Hydrophobic Portland cement oil well cement ,Rapid Hardening cement, low heat Portland cement, High strength Portland cement, super supplanted cement and Alumina cement.
Cement is a company which is one of the Birla Group companies a leader by its name.
It was incorated in 1967 with objective of becoming the leading producer of cements in this part of country. The plant here is one of the biggest in south India and can produce of cement with a capacity of 2500 metric tones per day.
The technical objectives of the company are to develop indregenous technology and integrating indigenous and foreign technology where ever necessary this company like other birla goup of companies in single pursuing the goal of complete self reliance in the field of cement production to offer customers comprehensive cost effective best possible products
Kesoram Cement Industry is one of the leading manufacturers of Cement in India. It is a dry process cement plant. The plant capacity is One Million ton’s per annum. It is located at Basantnagar in Karimnagar Dist. of Andhra Pradesh. Basantnagar is 8 K.M. away from the Ramagundam Railway Station, linking Madras to New Delhi. The Chairman of the Company is Syt.B.K.Birla.
The first unit at Basantnagar with a capacity of 2.1lakh tones per annum is incorporating hum olds suspension pre-heater system was commissioned during the year 1969. The second unit was set up in the year 1971 with a capacity of 2.1 lakh ton’s per annum and the third unit with a capacity of 2.5 lakh tones per annum went on stream in the year 1978. The coal for this company is being supplied by Singareni Collieries and the power from Captive Power Plant. The power demand for the factory is about 21 MW. Kesoram has got 2 DG sets of 4 MW each installed in the year 1987. Kesoram Cement has set up a 15 KW Captive Power Plant to facilitate for uninterrupted power supply for manufacturing of cement.
The company being a continuous process industry works round the clock and has an excellent record of performance achieving over 100% capacity utilization. In A.P. States Departments are located in different areas like Karimnagar, Warangal, Nizamabad, Vijayawada and Nellore. In the other states it has opened around 10 depots
Reply
#2

Thank you so much for your post.
Reply
#3

sir,i am completed btech ece with 70%...is there any openings in 2013 may please reply me sir my email id anjiyadav473[at]gmail.com
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: history of bardoli sugr factory, industry factory visit report, diamond factory, how much kesoram cement factory is big, manglam cement ltd morak, blob factory, simulation of factory using 8051,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  seminar report on limited slip differential pdf 0 739 25-09-2018, 11:59 PM
Last Post: Guest
  msds of ultratech cement 0 490 18-08-2018, 10:44 AM
Last Post: Guest
  Recruitment and selection procedure in itc limited and hul ltd 1 1,598 13-08-2018, 08:20 AM
Last Post: Alima
  factory act 1948 pdf in marathi 1 686 22-07-2018, 03:20 PM
Last Post: mahesh nale
  how to apply 14 principal of fayol in hindustan unilever limited 0 781 05-07-2018, 11:18 AM
Last Post: Guest
  factory act 1948 pdf in marathi 0 400 23-02-2018, 03:53 PM
Last Post: Guest
  questionnaire for cement retailer 1 702 17-01-2018, 01:06 PM
Last Post: dhanabhagya
  questionnaire for cement retailer 2 664 17-01-2018, 01:05 PM
Last Post: dhanabhagya
  questionnaire for cement dealers 1 773 13-01-2018, 11:56 AM
Last Post: dhanabhagya
  jobs in kesoram cement company ramagundam 1 486 13-01-2018, 11:49 AM
Last Post: dhanabhagya

Forum Jump: