kanti thermal power plant muzaffarpur bihar training mechanical
#1

Sir ,I am diploma student in mechanical engineering so mera 4th sem last chal raha hai aur 5th sem traning lagane hai , please help me
Reply
#2
Kanti Thermal Power Station also knowns as George Fernandes Thermal Power Plant Station(GFTPS) is located in Kanti, Muzaffarpur,90 km away from Patna, the capital of the Indian state of Bihar.It is managed by the Kanti Bijlee Utpadan Nigam Ltd (KBUN),-a joint venture between NTPC and BSEB Patna.The majority shares of the Joint Venture Company is hold by NTPC,with NTPC 64.57% and BSEB 35.43%.The plant has not been functional since 2003, however three successful trial runs have paved way for commercial production of Electricity by the end of 2013.In November 2013,Nitish Kumar said that another new 500MW power plant will be set up at Kanti. The first 195 MW unit was commissioned by BHEL at the 2x195 MW plant in May 2015.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: summer training report on thermal power plant pdf**d ppt, comtent summer training report on thermal power plant of mechanical engineering, basic civil and mechanical engineering ppt power plant, go javas in bihar where is, mechanical project in kanti bihar, muskan project bihar, gojava courier office in muzaffarpur bihar,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  power plant instrumentation by krishnaswamy pdf free download 3 24,067 10-02-2019, 07:00 PM
Last Post:
  jobs in kanti thermal power plant muzaffarpur 3 8,809 17-01-2018, 01:14 PM
Last Post: [email protected]
  list of mechanical companies in coimbatore with address pdf 2 1,447 30-04-2017, 08:14 PM
Last Post: Dinabandhu Murmu
  when are the application for lilitha nursing training 2016 1 7,534 07-04-2017, 12:40 PM
Last Post: jaseela123d
  when are the application for lilitha nursing training 2016 1 904 27-03-2017, 10:49 AM
Last Post: jaseela123d
  shanzu teachers training college fee structure 3 1,244 28-02-2017, 09:29 AM
Last Post: jaseela123d
  lilitha nursing training college 2017 intake 6 1,706 24-02-2017, 12:11 PM
Last Post: jaseela123d
  seminar topics in plant science and biotechnology 3 1,593 14-02-2017, 11:03 AM
Last Post: ijasti
  dlw summer training application form 2016 17 5 2,052 10-02-2017, 04:41 PM
Last Post: Arun Kumar yadav
  lilitha nursing training college 2017 intake 4 1,631 27-11-2016, 10:54 PM
Last Post: phelokazi khwele

Forum Jump: