19-07-2016, 11:26 AM
problems in design because of joint flexibility in prefabricated structures
ABSTRACT
There is a tremendous housing shortage in the world that can only be overcome by
innovative designs and enlightened production management. This paper presents a method
for fast erection of apartment housing units that have architectural flexibility, manufacturing
flexibility, and erection flexibility. The paper describes innovative jointing methods for large
panel erection and presents characteristics of an appropriate structural system to correspond
to the mechanical jointing and quick erection needs. Erection speeds using this method are
about ten times as fast as conventional methods. Details of erection requirements and
equipment are given.
Reference: http://studentbank.in/report-problems-in...z4EpcrCdok
http://sasurieengge-course-material/CIVIL/IV-Year%20Sem%208/CE2045%20Prefabricated%20Structures.pdf
https://scribddoc/253680811/3ce-2045-Prefabricated-Structuresunit3