internship in thermal power plant tuticorin
#1

i am a student of third year electrical and instrumentation engineering.i would like to undergo an internship in tuticorin thermal power plant. but unfortunately am not aware of how to apply it. so please help me to know about this.

Thank you.
Reply
#2

internship in thermal power plant tuticorin

TUTICORIN: Power generation in one unit of the 5x210 MW Tuticorin Thermal Power Station (TTPS) was hit after a fire broke out in the plant on Saturday.The accident is one among many such fire accidents that have occurred in the several thermal power plants in the state, in recent months. In August this year, a fire in a conveyor belt at a private thermal power plant in Tuticorin killed four employees and brought down precious power resources. Saturday's accident comes at a time when the state is facing acute power shortage and forcing the residents to face several hours of outages everyday.A senior official from the Tamil Nadu Generation and Distribution Corporation (Tangedco) said that the fire broke out in the power line supplying electricity to boiler in the third unit of TTPS. He said that the cause of the fire was not confirmed but was suspected to be due to a short circuit in the electricity supply line to the boiler of the unit.The fire broke out around 6am in the power supply line and the employees attempted to put off the fire. But sensing that it could be dangerous to continue their efforts they immediately rushed out to safety. "They switched off the power supply line to the unit. By that time, fire and rescue service personnel arrived and put off the fire. The damage was not extensive," said the official.As against the 1050 MW, TTPS could generate only 840 MW. However, officials said that power generation was resumed in the evening after the damaged cables and certain parts of the units were replaced.The frequency of the fire accidents and technical snags has become alarming in TTPS hitting electricity generation in the power-starved state. On October 10, power production was hit in one unit due to a puncture in the boiler tube while another unit was detected to have a puncture in the condenser tube.Earlier, on June 19, units I and III were shut down for three days due to water scarcity. Then on July 3, all five units were shut down for two days due to a major fire caused by friction at the coal conveyor belt, incurring a heavy loss of Rs 12 crore to the thermal power station.Another fire reported at the conveyor belt connecting the first and second coal crusher units on July 16, however, it reportedly had no impact on power generation.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: t turbine plant tuticorin, tangedco webmail, final year project in tuticorin thermal power plant, urea plant layout tuticorin, vlsi applications in tuticorin thermal power stations, ipt in thermal power plant in tuticorin, internship at kothagudem thermal power plant,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  power plant instrumentation by krishnaswamy pdf free download 3 24,610 10-02-2019, 07:00 PM
Last Post:
  vijayawada bsnl summer internship 2 1,549 16-05-2018, 12:14 PM
Last Post: sandhya angelina
  jobs in kanti thermal power plant muzaffarpur 3 8,995 17-01-2018, 01:14 PM
Last Post: [email protected]
  seminar topics in plant science and biotechnology 3 1,622 14-02-2017, 11:03 AM
Last Post: ijasti
  literature review of gearless power transmission system 2 1,758 23-09-2016, 09:07 AM
Last Post: Guest
  n6 civil engineering internship at basil read 3 838 22-07-2016, 04:02 PM
Last Post: jaseela123d
  advantages disadvantages of arduino automatic plant watering system 2 1,062 21-07-2016, 03:24 PM
Last Post: dhanabhagya
  download vtu advanced power electronics question papers 2 987 16-07-2016, 02:07 PM
Last Post: jaseela123d
  wireless ac power 230v line electrical appliances controlling system 2 841 15-07-2016, 02:14 PM
Last Post: jaseela123d
  companies offering internship for ece students in bangalore 2 727 14-07-2016, 04:32 PM
Last Post: dhanabhagya

Forum Jump: