inplant training procedure for tuticorin thermal power station
#1

I am Prince Samuel, from tiruchendur. I am will to participate in implant training in thermal powerplant, thoothukudi.. So that I need to know the procedure for implant training...

          So kindly reply a procedure for implant training...
Reply
#2

Tuticorin (Tamil: த்துக்குடி அனல் னின் லையமிலையம்) is a power plant located near Newport of Thoothukudi on the seafront of Bay of Bengal, South India.


It has 5 units with a total installed capacity of 1,050 MW and extends over 160 hectares. The entire unit is based on coal. Coal is transported by sea through the ship Coal transported by ship is given to crushers crushing coal particles to 10-20mm. Crushed coal is fed to coal mills with bowl roll through bunkers. Baked through forced draft fans. There are four mills around the furnace as well as the oil storage nozzles of the oil storage for tangential combustion. Haldia, Paradeep, Port of Vizag to TTPS.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: total station survey procedure ppt, ennore power themal inplant training procedure, inplant training procedure for tuticorin thermal power station, indian railway inplant training procedure, training and development procedure in amul, total station working procedure ppt, what is the procedure to apply for an inplant training in tuticorin power plant,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  vocational training report 0 638 18-11-2020, 03:08 PM
Last Post:
  Summer training pdf 0 1,294 29-02-2020, 05:48 PM
Last Post:
  someone with pecuniary common vindication or someone who power 0 415 09-09-2019, 06:23 AM
Last Post:
  someone with economic orthodox justification or someone who power 0 555 08-09-2019, 07:20 AM
Last Post:
  Graduate engineering training 0 1,857 29-12-2018, 06:38 PM
Last Post:
  Pwd training report 0 1,891 23-11-2018, 12:40 AM
Last Post:
  pwd summer training for mechanical 0 1,989 02-11-2018, 01:06 PM
Last Post: Guest
  industrial training report on 132 33 11 k v substation 0 8,559 29-10-2018, 12:20 PM
Last Post: Guest
  indian railway summer training report for ee 0 1,835 23-10-2018, 02:37 PM
Last Post: Guest
  vijayawada thermal power station internship contact details 0 853 17-10-2018, 11:36 AM
Last Post: Guest

Forum Jump: