Implementation of Control Unit using SCADA System for Filling System
#1

[attachment=15579]
Abstract
Supervisory Control and Data Acquisition (SCADA) system was being used in industries to control easily and simply. It is a computer control and a software application. This paper describes implementation of control unit to control the filling system with modeling design. It aims a manufacturing system using SCADA control system. It has been designed to work on the computer for the process. The main purpose of this paper is to implement the hardware components for the filling process and to interface between master station and control unit for controlling the data. Microcontroller and control circuits have been used for control unit. This paper will support manufacturing systems to be easy, simple and accurate. Keywords—SCADA System, Control Unit, Manufacturing system, Motor driver, Microcontroller and Filling process.
I. INTRODUCTION
HIS paper implements the filling operation of pure drinking water plant, and this can be use other systems of various industries. It includes about how SCADA systems use in the industry. So, it includes SCADA components and protocols of the system. And it uses the facts that include how interface and monitor the process. It is mainly implemented SCADA software to apply for the control and monitoring between hardware processing and computer. It applies interfacing sever protocol when needed between the SCADA software and the hardware process. Filling process designs the model with nearly hardware devices. It uses dc motor drivers, sensing drivers, Programmable Interface Controller (PIC) microcontroller device and parallel port communication. So, a typical SCADA control system consists of one or more remote terminal units (RTU or PLCs) connected to a variety of sensors and actuators, and relaying information to a master station. Fig.1 shows the control system of filling process using SCADA. According to SCADA control system, the hardware components of the filling process are implemented and interfaced between the microcontroller and master station. In this project, the control unit will be used for filling process. But, the four main components will not be used because it is difficult to get the PLC hardware component. So, it will use PIC 16E877A instead of PLC hardware and parallel port as interface communication. Fig. 1 SCADA system for filling system
II. ANALYSIS OF CONTROL UNIT
This system is two sections in filling process- one is control process of the water level in the tank. This control section will make only the water level. When the water level reaches at the upper level, the pumping motor is OFF from the running mode. On the other hand, it is ON when the water level is at the lower level. Second is the operation of the filling process. Firstly, the position sensor will sense the bottles to fill the water whether the specified position on the conveyor or not. If the bottle reaches at this position, the filling motor will be operated. Then, the counter motor will be operated when the bottles reach at the counter sensor to push on the second conveyor and count the number of the bottles to pack when there are ten bottles. If the bottles have not only at the position sensor but also at the counter sensor, it will operate the counter motor to drive the second conveyor motor after the position sensor has operated to drive the filling motor. If the counter has ten bottles, the counter will reset. The overview block diagram of this project is shown in Fig. 2.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: abstract for scada implementation, gsm based scada implementation project, engine control unit software, scada system for traction ppt, circuit description of scada implementation based on wireless using rf technology, seminar topics on scada system, www scada system ppt,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  INTEGRATED EMERGENCY RESPONSE SYSTEM USING EMBEDDED SYSTEM seminar presentation 1 9,027 19-11-2018, 08:40 PM
Last Post:
  AUTOMATIC STREET LIGHT CONTROL WITH SENSOR TECHNOLOGY seminar class 2 11,601 22-05-2017, 11:07 AM
Last Post: yasminoth93
  VECTOR CONTROL DRIVE OF PERMANENT MAGNET SYNCHRONOUS MOTOR USING MATLAB/SIMULINK seminar class 2 12,120 05-04-2017, 01:18 PM
Last Post: surya256
  GSM based Control Panel for Agricultural and Domestic Water Pumps seminar addict 4 24,289 08-09-2016, 10:58 AM
Last Post: ijasti
  DESIGN AND IMPLEMENTATION OF GOLAY ENCODER AND DECODER computer science crazy 2 23,280 26-08-2016, 03:46 PM
Last Post: anasek
  MICROCONTROLLER BASED DAM GATE CONTROL SYSTEM full report seminar class 13 17,144 19-06-2016, 07:53 PM
Last Post: Saianjana
  GSM based SCADA implementation using Microcontroller project report tiger 19 27,517 31-05-2016, 12:13 PM
Last Post: dhanabhagya
  WIRE LESS SPEED CONTROL OF AC MOTOR (USING MOBILE) smart paper boy 6 11,195 24-02-2016, 02:05 PM
Last Post: seminar report asees
  AUTOMATIC STREET LIGHT CONTROL-EMBEDDED BASED PROJECT project topics 18 30,071 11-02-2016, 02:03 PM
Last Post: seminar report asees
  Wireless based Automatic dam water level control shutter open /closed with emergency smart paper boy 4 11,322 11-09-2015, 02:00 PM
Last Post: seminar report asees

Forum Jump: