HAL TEJAS
#1

PRESENTED BY:
KUNDAN SINGH BORA

[attachment=12060]
Introduction
• HAL Tejas is a lightweight multirole jet fighter developed by India.
• It is a tailless, compound delta wing design powered by a single engine.
• It came from the Light Combat Aircraft (LCA).
• The Tejas has the delta wing configuration, with no tailplanes or foreplanes, features a single vertical fin.
• It integrates technologies such as relaxed static stability, fly-by-wire flight control system, advanced digital cockpit, multi-mode radar, integrated digital avionics system, advanced composite material structures and a flat rated engine.
• The IAF is reported to have a requirement for 200 single-seat and 20 two-seat conversion trainers, while the Indian Navy may order up to 40 single-seaters to replace its Sea Harrier FRS.51 and Harrier T.60.
HISTORY
• The LCA design was finalised in 1990 as a small tail-less delta winged machine with relaxed static stability (RSS) to enhance maneuverability performance.
• Phase 1 would focus on "proof of concept" and would comprise the design, development and testing (DDT) of two technology demonstrator aircraft (TD-1 and TD-2) and fabrication of a structural test specimen (STS) airframe; only after successful testing of the TD aircraft would the Indian government give its full support to the LCA design.
• Phase 2 would consist of the manufacturing of three more prototype vehicles (PV-3 as the production variant, PV-4 as the naval variant, and PV-5 as the trainer variant) and a fatigue test specimen, and the construction of further development and test facilities at various work centres.
LCA Programme
• The LCA programme was launched in 1983.
• The principal and most obvious goal was the development of a replacement aircraft for India's ageing MiG-21 fighters.
• The MiG-21 has been the mainstay of the Indian Air Force since the 1970s.
• The LCA programme's other main objective was to serve as the vehicle for an across-the-board advancement of India's domestic aerospace industry.
Engine and Propulsion
• Initially, it was decided to equip the prototype aircraft with the General Electric F404-GE-F2J3 afterburning turbofan engine. Simultaneously, in 1986, a parallel programme to develop an indigenous powerplant was also launched. Led by the Gas Turbine Research Establishment, the GTRE GTX-35VS, named "Kaveri", was expected to replace the F404 on all production aircraft
Design
• The Tejas is single-engined multirole fighter which features a tailless, compound delta planform and is designed with "relaxed static stability" for enhanced maneuverability.
• The tailless, compound-delta planform is designed to keep the Tejas small and lightweight.
• All weapons are carried on one or more of seven hardpoints with total capacity of greater than 4,000 kg: three stations under each wing and one on the under-fuselage centreline.
Air Frame
• The LCA is constructed of aluminium-lithium alloys, carbon-fibre composites (C-FC), and titanium-alloy steels.
• The Tejas employs C-FC materials for up to 45% of its airframe by weight, including in the fuselage (doors and skins), wings (skin, spars and ribs), elevons, tailfin, rudder, air brakes and landing gear doors.
• Apart from making the plane much lighter, there are also fewer joints or rivets, which increases the aircraft's reliability and lowers its susceptibility to structural fatigue cracks.
Characteristics
• Crew: 1
• Length: 13.20 m (43 ft 4 in)
• Wingspan: 8.20 m (26 ft 11 in)
• Height: 4.40 m (14 ft 9 in)
• Wing area: 38.4 m² (413 ft²)
• Empty weight: 6,560 kg (14,460 lb)
• Loaded weight: 10,500 kg (23,100 lb)
• Max takeoff weight: 13,300 kg (29,540 lb)
• Powerplant: 1× General Electric F404-GE-IN20 turbofan
• Dry thrust: 53.9 kN (11,250 lbf)
• Thrust with afterburner: 85 kN (19,000 lbf)
• Internal fuel capacity: 2458 kg
• External fuel capacity: 2x1200 litre drop tank at inboard, 1x725 litre drop tank under fuselage
Performance
• Maximum speed: Mach 1.8 (2,376+ km/h at high altitude) at 15,000 m
• Range: 3,000 km (1,840 mi) without refueling
• Service ceiling: 15,000 m (49,200 ft (engine re-igniter safely capable))
• Wing loading: 221.4 kg/m² (45.35 lb/ft²)
• Thrust/weight: 0.91
Recent Development
• The first production variant of the 'Tejas' (LSP-1) flew on June 2008.
• Tejas completed 1000 Test Flights by January, 2009 with more than 530 hours of in-flight testing.
• By June 2010, Tejas had also completed the second phase of hot weather trials.
• Initial Operating Clearance (IOC) for the Tejas was awarded on 10 January 2011 by Defence Minister A K Antony to Chief of Air Staff Air Chief Marshal P V Naik.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: report on hal lucknow, building hal**tamil details, har muskil ka hal rupayan, seminar ppt on tejas aircraft, ppt on lca tejas, hal ppt download, 80211 hal,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Forum Jump: