Design Features

GIS technology: compact, low-life cycle cost and
modular for indoor and outdoor applications
Modular design, factory pre-assembled and tested units
Space requirement less than 20 % of comparable AIS
Safety (enclosed energized components)
Continous monitoring of SF6 densitity
Sealed for operating life > 50 years
Major inspection: not before 25 years 1)
GIS Pressure Systems
Closed pressure systems:
The closed pressure system uses isolated

apparatus compartments with o-ring

sealed bolted flanges.
The tightness characteristic of a closed

pressure system stated by the

manufacturer shall be consistent with a

minimum maintenance and inspection

philosophy.
The leakage rate from any single

compartment of GIS to atmosphere and

between compartments shall not exceed

0.5 % per year for the service life of

the equipment.*
Practical experiences to the today's

design of GIS show as low as 0.2 % per

year.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Tagged Pages: http seminarprojects org t gas insulated substation full report page 4, gas insulated seminar report, gas insulated transformer seminar abstract, conclusion of gas insulated substation, gis substation ct, gas insulated substation seminar topic, seminar report on gas insulated switch gear,
Popular Searches: gas insulated substations seminar report, gas insulated substation trivandrum, constructional aspects of gas insulated substation, 110 kv substation project report, report gas insulated substation system, seminar report on gas insulated switch gear, report for internship for 110kv substation,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Messages In This Thread
RE: gas insulated substation full report - by project topics - 23-04-2010, 02:43 PM
RE: gas insulated substation full report - by Guest - 27-12-2012, 07:46 AM
RE: gas insulated substation full report - by Guest - 06-08-2013, 01:14 PM

Possibly Related Threads...
Thread Author Replies Views Last Post
  man made sun full report seminar presentation 2 3,446 26-12-2014, 05:39 AM
Last Post: Guest
  microprocessor based system of automatic synchronizer full report computer science technology 10 8,580 05-09-2014, 10:44 PM
Last Post: seminar report asees
  artificial intelligence techniques in power systems full report computer science technology 3 5,735 08-08-2014, 10:39 PM
Last Post: seminar report asees
  thermoelectric power generation full report project report tiger 8 8,269 07-03-2014, 07:43 PM
Last Post: Guest
  powerline communication full report computer science technology 15 16,877 02-09-2013, 11:28 AM
Last Post: computer topic
  Four-Quadrant Control of Switched Reluctance Motors full report seminar topics 3 5,226 14-05-2013, 01:16 PM
Last Post: Guest
  MODELLING OF TRANSFORMER full report seminar class 2 3,862 11-04-2013, 11:44 AM
Last Post: computer topic
  CONDITION MONITORING OF TRANSFORMERS full report smart paper boy 4 3,371 22-02-2013, 02:23 PM
Last Post: seminar details
  protection of transmission lines using gps full report computer science technology 9 19,993 16-10-2012, 01:25 PM
Last Post: seminar details
  Variable Voltage And Variable Frequency drives full report seminar presentation 2 5,683 04-10-2012, 12:20 PM
Last Post: seminar details

Forum Jump: