Enabling Contiguous Node Scheduling on the Cray XT3
#1

[attachment=567]
Abstract:
A flexible job scheduling environment to enable jobs to be placed onto its Cray XT3 system in ways that can help them achieve better performance, work on a graphical machine monitor to help visualize jobs placed on the system, and node assignment changes to help minimize communication overhead to all jobs. system changes that have been made to enable them will be discussed Xt3dmon has been developed that features several views of the machine including both physical and wired (logical) ones using node attribute information from the processor table of the XTAdmin database within the System Database (SDB). a physical view from Xt3dmon of the machine in two rows with nodes grouped by cabinet, cage and module. a wired view of the machine which helps to visualize the interconnect topology. In both the physical and wired views nodes may be color coded to display the location of jobs within the system. Using both views, this tool has helped to visualize the proximity of nodes assigned to jobs. Xt3dmon has been an important tool in helping to understand both the node connections and node selections from node allocation algorithms.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: cray xt3 wiki, scheduling, the scheduling process, enabling devices, param supercomputer is better or cray 2, university course scheduling, scheduling programsallocation**at week,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  Conflict-free scheduling and routing of automated guided vehicles in mesh topologies computer girl 0 829 05-06-2012, 12:52 PM
Last Post: computer girl
  Rover Technology Enabling Scalable Location Aware Computing shabeer 3 8,563 26-01-2012, 10:05 AM
Last Post: seminar addict
  An ant algorithm for balanced job scheduling in grids full report seminar class 0 1,655 12-05-2011, 09:44 AM
Last Post: seminar class
  Self-Repairing Tree Topology Enabling Content-Based Routing in Mobile Ad Hoc Networks project topics 0 1,011 02-05-2011, 09:58 AM
Last Post: project topics
  Real Time Task Scheduling seminar class 0 1,500 21-04-2011, 10:04 AM
Last Post: seminar class
  add, remove node by changing the weight seminar class 0 1,265 28-03-2011, 11:41 AM
Last Post: seminar class
  COMPARISON OF DIFFERENT TYPES OF SCHEDULING ALGORITHM IN WIRE NETWORK seminar surveyer 0 1,962 04-01-2011, 02:44 PM
Last Post: seminar surveyer
  HIGH THROUGHPUT DISK SCHEDULING WITH FAIR BANDWIDTH DISTRIBUTION Wifi 0 1,545 31-10-2010, 09:28 PM
Last Post: Wifi
  OCGRR: A New Scheduling Algorithm for Differentiated Services Networks computer science crazy 1 2,599 07-09-2010, 12:21 PM
Last Post: sweety27
  DEMAND – BASED BLUTOOTH SCHEDULING full report seminar presentation 0 932 06-06-2010, 11:53 PM
Last Post: seminar presentation

Forum Jump: