Why are hilly roads constructed using slope?
Reply
#2

why are hilly roads constructed using slope

ROADS

The construction of roads in hilly terrain leads to dislocation and disruption of the delicate balance of the eco-system and creates environmental problems.

The hill environment being unique has inherent problems of soil erosion, geological disturbance, drainage, landslide, loss of natural vegetation and forestry, wildlife, aesthetic degradation, air, water and noise pollution, debris disposal, construction camp sites, availability of construction water and the usual problems of quarry and burrow area rehabilitation during construction of highways and maintenance of fragile eco-system.

The environmental protection and ecological sustainable development is a matter of increasing concern especially because of the geological disturbances by blasting, excavation and cutting of hill slopes, for the construction of roads, in the young and fragile Himalayas. Landslides pose serious problems in areas having weak and unprotected slopes. The situation becomes more serious in the rainy season when the exposure of the sloping surface becomes prone to erosion by water and leads to the formation of deep gullies.

Contractors adopt the cheapest way of disposal of the excavated rock for road construction by pushing it down the slopes of the hill causing huge damage to the vegetation including forests, pastures, and agricultural lands. The whole mountain below the constructed road at many places gets denuded and environmentally degraded. In some places not a blade of grass remains on the surface. Such disposal of excavated earth also results to siltation of river basins, interruption of the natural drainage system and loss of natural springs lying beneath the alignment of the road.

Legally the construction agency can carry out construction activity within the ?Right of Way? (ROW). The disposal of the excavated debris down the slope the contractors violates the ROW. The contractor choose the easiest way out and because of corruption and to some extent insensitivity of the government engineers, no action is taken by any State Government or MoEF for the violation of law.

Environment degradation is being wantonly permitted. In nearly all cases the ?Right of Way? limitation is not being adhered to.

The excavated earth should be used for land reclamation and leveling of land. In the hills the land near roads is sold at a premium. The development agency can sell the land they reclaim as long the reclamation is not of a temporary nature.

We have initiated action in this regard by filing a Public Interest Litigation (PIL) in Supreme Court of India in which the Ministry of Environment & Forests and the Governments of Uttarakhand and Himachal Pradesh have been issued notices.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: construction of roads in hilly region, constructed language based on esperanto, why we using microcontroller for secured room access system, ppt on a multi storeyed building constructed in a hilly area, roads construction in hilly regions ppt, jute as constructed roads, why we are using wireless application protocol ppt,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  why aggregates are heated to 170 degrees while adding plastic in road construction 2 1,114 19-10-2017, 12:22 PM
Last Post: jaseela123d
  which modulation is best and why? 1 915 13-04-2017, 11:33 AM
Last Post: jaseela123d
  bio engg techniques for erosion control in slope ppt 1 690 12-04-2017, 11:10 AM
Last Post: jaseela123d
Rainbow construction of roads in hilly areas ppt 1 949 29-03-2017, 02:18 PM
Last Post: jaseela123d
Smile construction challenges for bridges in hilly area pdf 1 958 17-03-2017, 04:17 PM
Last Post: jaseela123d
Big Grin new techniques of erosion control on hill roads pdf 1 956 16-03-2017, 01:15 PM
Last Post: jaseela123d
  construction challenges for bridges in hilly area in ieee format 1 864 15-03-2017, 02:32 PM
Last Post: jaseela123d
  data encryption and decryption using microconteoller using ir communication 1 878 02-03-2017, 04:23 PM
Last Post: jaseela123d
  construction challenges for bridges in hilly areas ppt presentation 5 4,615 06-04-2016, 12:02 PM
Last Post: dhanabhagya
  speech compression using haar wavelets using matlab 2 1,050 02-03-2016, 02:39 PM
Last Post: seminar report asees

Forum Jump: