AUTOMATIC WATER LEVEL CONTROLLER
#1

WORKING PRINCIPLE:

[attachment=16277]

Attach length copper wire to one stick and make two points (top and bottom) on other stick with copper wire; and mark them point A, B, C as shown in the diagram. Connect points A, B and C to the main circuit. The IC 555is used in the circuit as an astable multivibrator. The IC is an 8pin duel-in-line IC. When there is water in between the points A and C, pin no 3 voltage of the IC becomes high and transistor BC 148 operates the relay. As a result the motor starts and fills the tank. When the volts reaches the top level. A comes in contact with Band pin no3 voltage becomes low. The relay then changes the position and motor becomes OF. When the water level becomes low, the motor starts again.


Reply
#2

to get information about the topic Water level Controller full report ppt and related topic refer the page link bellow

http://seminarsprojects.in/attachment.php?aid=8590

http://studentbank.in/report-water-level-controller

http://studentbank.in/report-automatic-w...controller

http://studentbank.in/report-automatic-w...er-circuit

http://studentbank.in/report-simple-auto...controller


http://studentbank.in/report-boiler-wate...rol-system
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: water level controller verilog coding, scope of automatic water level controller in future, water level controller mic, components of a simple automatic water level controller, automatic water level controller abstract, automatic water level control system, ca no3 2,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  AUTOMATIC PHASE CHANGER full report seminar paper 3 3,555 27-03-2015, 10:06 AM
Last Post: seminar report asees
  AUTOMATED CAR BRAKING SYSTEM USING FUZZY LOGIC CONTROLLER project uploader 3 3,827 15-05-2013, 09:52 AM
Last Post: computer topic
  WATERPROOFING BELOW GROUND LEVEL SEMINAR REPORT seminar addict 1 2,140 12-02-2013, 01:42 PM
Last Post: Guest
  Water resource management smart paper boy 1 4,240 04-02-2013, 03:46 PM
Last Post: seminar details
  Implementing a PID Controller Using a PIC18 MCU seminar addict 1 1,739 21-12-2012, 10:36 AM
Last Post: seminar details
  AUTOMATIC ROOM LIGHT CONTROLLER WITH VISITOR COUNTER (IR SENSOR). seminar details 1 2,512 22-11-2012, 12:09 PM
Last Post: seminar details
  Development of Power Factor Controller using PIC Microcontroller seminar paper 2 2,162 02-11-2012, 04:43 PM
Last Post: seminar details
  automatic intelligent toll tax seminar addict 1 1,480 02-11-2012, 12:50 PM
Last Post: seminar details
  automatic power factor controller - Presentation Transcript seminar paper 1 1,465 27-10-2012, 01:28 PM
Last Post: seminar details
  AUTOMATIC TIMETABLE GENERATOR seminar paper 1 5,386 24-10-2012, 02:01 PM
Last Post: seminar details

Forum Jump: