dlw training report for civil engg pdf
#1

pls provide DLW CIVIL SUMMER TRAINING REPORT as soon as possible..
Reply
#2
About DLW (DIESEL LOCOMOTIVE WORKS)

It is a production unit owned by Indian Railways, for which it manufactures diesel-electric locomotive and its spares part.
It was established in collaboration with M\s ALCO (American Locomotive Company), USA.
Founded in 1961, the DLW rolled out its first locomotive three year later, on January 3, 1964.
It has evolved diesel-electric locomotive manufacturing plant, capable of building all components of the locomotive in-house, including the engine, super structure, and fabricated bogies and under frames.
Diesel-electric locomotive were introduced to exploit their versatility, low maintenance requirements and cost effectiveness as compared to steam engine.
Got its first ISO certification in 1997 and ISO-9001 and ISO-14001 in December 2002.
Today, it (DLW) produces advance locomotive having output range from 2600 to 4000 hp.
It has supplied locomotive to other countries such as Sri Lanka, Bangladesh, Malaysia, Tanzania, and Vietnam etc.

Engine Assembly & Testing

Pre-inspected engine block, crankshaft, cylinder liners, pistons, connecting rods, cylinder heads, exhaust manifold, turbo supercharger and all related piping are used in assembly of engine. Electrical machines like traction alternator, auxiliary generator and exiter are there after coupled on the engine.
The complete power pack with electrics are tested on computerized Engine Test Bed to verify prescribed horsepower output. Vital parameters of engine health are checked to assure the quality of product.

LOCO ASSEMBLY shop

Tested engines are receives from Engine Division.
Similarly under frames are received from Loco frame shop and assembled trucks from Truck machine shop.
Super structure compartments and contractor compartment are received from respective manufacturing and assembly shops of Vehicle Division.
Important alignments like crank shaft deflection, compressor alignment and Eddy Current clutch/radiator fan alignment are done during assembly stage.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: best seminar report in civil engg pdf, civil engg summer training of flyover construction report, civil engg filed training report pdf, a report on civil engg training in pdf, civil engg training project report, summer training civil engg file, standard seminar report for civil engg,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  vocational training report 0 649 18-11-2020, 03:08 PM
Last Post:
  Report in PDF format 0 7,385 18-05-2020, 11:28 AM
Last Post:
  Summer training pdf 0 1,305 29-02-2020, 05:48 PM
Last Post:
  Graduate engineering training 0 1,869 29-12-2018, 06:38 PM
Last Post:
  Pwd training report 0 1,901 23-11-2018, 12:40 AM
Last Post:
  civil engineering extensive survey project report 0 2,241 03-11-2018, 11:26 PM
Last Post: Guest
  pwd summer training for mechanical 0 2,001 02-11-2018, 01:06 PM
Last Post: Guest
  industrial training report on 132 33 11 k v substation 0 8,643 29-10-2018, 12:20 PM
Last Post: Guest
  indian railway summer training report for ee 0 1,843 23-10-2018, 02:37 PM
Last Post: Guest
  diamond ultimate semiconductor seminar report pdf 0 6,291 18-10-2018, 11:41 AM
Last Post: Guest

Forum Jump: