date of form for summer training of clw chittaranjan kolkata
#3

Chittaranjan Locomotive Works (CLW) has been named after the great freedom of combat, the leader and statesmen Deshbandhu Chittaranjan Das. Production activity began on January 26, 1950, the day India became the Republic. The initial product of Chittaranjan Locomotive Works was Steam Locomotive. In the period 1950-1972 Chittaranjan Locomotive Works resulted in a total of 2351 steam locomotives. From 1968 to 1993 CLW produced 842 diesel locomotives and from 1961 to uptill 31-12-16 total 5905 us of electric locomotives of different types. CLW has proven itself to be one of the most successful, promising and reliable locomotive manufacturers over the years. It has transformed from being a manufacturer of steam locomotives to that of diesel locomotives and finally to modern, high-power, electric locomotives. The company has borne fruit and today CLW is proud to produce state-of-the-art three-phase insane with all the modern features of the latest "Isolated Gate Bipolar Transistor" (IGBT) technology.


Founded in 1950, the industrial unit owned by the Indian Railroad bears the name of the Indian freedom fighter Chittaranjan Das. The manufacturing unit was established in a location close to the Chittaranjan railway station.

The municipality of 18.34 km2, which included a factory, 191 km (119 miles) of roads, 43 schools, 9,131 staff quarters, 8 clinics (including a 200-bed hospital) and 7 markets, was built at a cost of ₹ 140 million (US $ 2.2 million) and had a population of more than 80,000.

The factory began production of steam locomotives on January 26, 1950 (the date India officially declared a Republic), in collaboration with the North British Locomotive Company. On November 1, 1950 Indian President Dr. Rajendra Prasad formally dedicated the company's first rail-steam engine (a WG class locomotive bearing registration number 8401) to freedom fighter Deshbandhu Chittranjan Das. The name of the nearby Mihijam railway station was also changed to Chittaranjan. Many of the specialized machines needed to manufacture steam locomotives were obtained from the Vulcan Smelter in England, formerly a major supplier of locomotives to India, which at the moment was moving from the construction of steam locomotives to diesel.

After 1968 the factory began to manufacture diesel-hydraulic locomotives. Production of steam and diesel locomotives was discontinued in 1973 and 1994, respectively. Since then, the company has been manufacturing only electric railroad engines. It is now the only government electric locomotive factory in India.

The factory gets its iron and steel from IISCO Steel Plant, Asansol and Tata Steel, Jamshedpur and Maelon Dam hydel power. The municipality under CLW is bordered by high limits and 3 main gates, and guarded by the Railway Protection Force ), The Special Force of Railway Protection (RPSF) and also the West Bengal Police.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: kolkata doordarshan summer training, winter training in bsnl in kolkata, doordarshan summer training in kolkata, summer training for mechanical engineering in clw chittaranjan, mma training centre in kolkata, summer training at clw, doordarshan kolkata training,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Messages In This Thread
RE: date of form for summer training of clw chittaranjan kolkata - by jaseela123d - 05-05-2017, 09:52 AM

Possibly Related Threads...
Thread Author Replies Views Last Post
  Summer internship in verka milk plant, Amritsar 0 1,595 21-02-2023, 02:07 PM
Last Post:
  Summer internship in verka milk plant , Amritsar. 0 1,516 21-02-2023, 02:05 PM
Last Post:
  vocational training report 0 718 18-11-2020, 03:08 PM
Last Post:
  Summer training pdf 0 1,379 29-02-2020, 05:48 PM
Last Post:
  Graduate engineering training 0 1,940 29-12-2018, 06:38 PM
Last Post:
  Pwd training report 0 1,955 23-11-2018, 12:40 AM
Last Post:
  pwd summer training for mechanical 0 2,070 02-11-2018, 01:06 PM
Last Post: Guest
  industrial training report on 132 33 11 k v substation 0 9,330 29-10-2018, 12:20 PM
Last Post: Guest
  indian railway summer training report for ee 0 1,898 23-10-2018, 02:37 PM
Last Post: Guest
  fomema appeal form download 0 705 08-10-2018, 12:25 PM
Last Post: Guest

Forum Jump: