critical path method matlab code
#1

ok .good


The essential technique for using CPM is to construct a model of the project that includes the following:

A list of all activities required to complete the project (also known as Work Breakdown Structure)
The time (duration) that each activity will take to completion, and
The dependencies between the activities

For a test case, let's assume the following picture:
Reply
#2

critical path method matlab code

Abstract

The critical path method (CPM) is an algorithm for scheduling a set of project activities.The critical path method (CPM) is a project modeling technique developed in the late 1950s by Morgan R. Walker of DuPont and James E. Kelley, Jr. of Remington Rand.[2] Kelley and Walker related their memories of the development of CPM in 1989. Kelley attributed the term "critical path" to the developers of the Program Evaluation and Review Technique which was developed at about the same time by Booz Allen Hamilton and the U.S. Navy.The precursors of what came to be known as Critical Path were developed and put into practice by DuPont between 1940 and 1943 and contributed to the success of the Manhattan Project.CPM is commonly used with all forms of projects, including construction, aerospace and defense, software development, research projects, product development, engineering, and plant maintenance, among others. Any project with interdependent activities can apply this method of mathematical analysis. Although the original CPM program and approach is no longer used,the term is generally applied to any approach used to analyze a project network logic diagram.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Tagged Pages: critical path analysis in matlab, critical path method matlab code,
Popular Searches: availdoctors cpm, www lottarysambat cpm, critical path method seminar report, remington sidekick, amaruajala cpm, critical path mba notes pdf, www lottarysambat,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  image encryption and decryption using rsa algorithm in matlab 2 8,090 29-05-2017, 04:17 PM
Last Post: Priyanka Bidikar
  download liver tumor ct scan image in matlab with source code 4 8,246 21-05-2017, 09:54 PM
Last Post: abdulrahmanmashaal
  MATLAB codes needed for powerline communication 1 8,255 12-04-2017, 05:00 PM
Last Post: jaseela123d
  matlab code for wavelet based ofdm transmitter 1 940 24-02-2017, 11:18 AM
Last Post: ijasti
  code to extract brain tumor detection using matlab 2 1,087 17-10-2016, 04:32 PM
Last Post: girish123ak
  f5 algorithm steganography matlab code 2 889 04-10-2016, 03:00 AM
Last Post: [email protected]
  color image segmentation using jseg algorithm in matlab code 2 889 29-09-2016, 12:07 PM
Last Post: Guest
  matlab code for retinal hemorrhage detection in fundus images 2 877 24-08-2016, 01:10 AM
Last Post: [email protected]
  matlab code of directional filter bank 1 869 13-08-2016, 11:27 AM
Last Post: jaseela123d
  matlab xy routing algorithm 2 848 12-08-2016, 09:16 PM
Last Post: khant

Forum Jump: