CONSTRUCTION WASTE RECYCLING
[attachment=1800]

INTRODUCTION

The promotion of enviornmental management and the mission of sustainable development

have exerted the pressure demanding for the adoption of proper methods to protect the

enviornment across all industries including construction.
Construction by nature is not an eco-friendly activity.
Construction,renovation and demolition activities leads to the formation of waste.

NEED FOR ADOPTION OF PROPER METHODS OF RECYCLING

It reduces the demand up on new resources.
Cuts down the cost and effort of transport and production.
Use waste which would otherwise be lost to landfill sites.

CONSTRUCTION WASTE PROBLEM

WASTE- Material by-product of human and industrial activity that has no residual

value.
Need for Comprehensive construction waste management in every site.
Every personnel,from the management to the operational level should work for the goal

of construction waste management.


AGGREGATE FROM CONSTRUCTION AND DEMOLITION WASTE

Recycled precast elements and cubes after testing (the aggregate could be relatively

clean with only cement paste adhering to it).
Demolished concrete building(aggregate could be contaminated with bricks and tiles,

sand and dust, timber, plastics, cardboard and paper and metals.)
Used as a subtitle for natural coarse aggregates in concrete


FACTORS THAT ASSESS THE QUALITY OF RECYCLED AGGREGATE

Size distribution
It has been generally accepted that recycled aggregates either fine or coarse

can be obtained by primary and secondary crushing and subsequent removal of

impurities.
The best particle distribution can be achieved by primary crushing and then

secondary crushing, but a single crushing process is more effective from the economic

point of view.

Absorption
The water absorption in Recycled Aggregates ranges from ( 3-12% ), this value

is much higher than that of natural aggregates whose absorption is about ( 0.5- 1 %

).

Abrasion resistance
Use of such aggregates as sub base in flexible pavements show promising

results. These recycled aggregates have also been used in generating concrete that is

further used in rigid pavements .

PROPERTIES OF FRESH RECYCLED AGGREGATE CONCRETE

The air content of recycled aggregate concrete is slightly higher ( 4-5 % ) than

concrete with natural aggregate. This increased air content in the recycled concrete

leads to reduction in the density of fresh concrete.

The bulk density of fresh concrete made with natural aggregates is in the range of

2400 kg/m3, where as the concrete made with recycled aggregates is significantly

lighter, 2150 kg/m3.


VIABLE TECHNOLOGY ON CONSTRUCTION WASTE RECYCLING

When considering a recyclable material, three major areas need to be taken in to

account are:
Economy
Compatibility with other materials
Material properties


DIFFERENT WASTES IN A CONSTRUCTION SITE

Brick
Bricks arising from demolition may be contaminated with more mortar, plaster

and are often mixed with other materials such as timber and concrete.In recent years,

bricks are commonly crushed to form filling materials.
Concrete
The most usual way to recycle concrete rubble is categorized as:
a) Bound ( natural aggregate replacement in new concrete )
b) Un bound ( road base, trench etc )


Ferrous Metal

It is by far the most profitable and recyclable material.
In India more than 80% scrap arising is recycled. Scrap steel is almost totally

recycled and allowed repeated recycling. 100% steel can be recycled to avoid wastage

at construction site.


Masonry

Masonry is normally crushed as recycled masonry aggregate.
A special application of recycled masonry aggregate is to use it as thermal

insulating concrete.
Another potential application for recycled masonry aggregate is to use it as

aggregate in traditional clay bricks.


Non Ferrous Metal

The main non ferrous metal collected from construction and demolition sites

are alluminium, copper, lead and zinc .
In India alluminium usage is up to 95000 tonnes with about 70% recycled in 2004.

Copper is recycled up to 119000 tonnes out of a national market of 262000 tonnes.


Paper And Cardboard

Paper and paper board comprise approximately 37% construction and demolition

wastes by volume.It usually attracts recyclers to reprocess them as new paper product

by purification.


Timber

Timber waste from construction and demolition works is produced in large

quantity all over the world.
Whole timber arising from construction and demolition works can be utilized easily

and directly for reused in other construction projects after cleaning, denailing and

sizing.


BARRIERS IN PROMOTING USE OF RECYCLED MATERIALS

Lack of appropriately located recycling facilities.
Absence of appropriate technology.
Lack of awareness


CONCLUSION

In order to reduce the construction waste, during the time of construction

order only the correct amount of raw materials. Proper care should be taken to ensure

the protection of materials being delivered and stored in the site. When a structure

is being demolished, salvage as much of the more valuable fittings and materials as

possible. Any suitable substitute for aggregate should be considered during the

construction. It is the duty of an engineer to revaluvate technical specification for

materials where strength and safety do not have to be compromised to permit the use

of recycled materials. As sorting and recycling facilities become more wide spread

and better developed it will be easier to redirect our waste from landfill.
Reply
#2
can you plz upload the report.............
Reply
#3

To get more information about the topic "construction waste recycling" please refer the page link below


http://studentbank.in/report-constructio...ort--10092
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: telephone book recycling, seminar on utilization of waste in construction, project recycling waste paper, project of b ed on recycling waste paper, recycling of construction and demolition waste methods india, comparison of phone recycling, bandwidth recycling,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  Advanced Construction Materials Computer Science Clay 3 7,908 18-10-2016, 03:46 PM
Last Post: dhanabhagya
  USE OF DISCRETE FIBER IN ROAD CONSTRUCTION project report helper 2 8,089 07-04-2016, 06:49 PM
Last Post: manoj8058
  RAINWATER HARVESTING AND ARTIFICIAL RECHARGE TO GROUND WATER full report project report tiger 11 11,770 17-12-2015, 02:13 PM
Last Post: seminar report asees
  SOIL STABILIZATION BY WASTE PLASTIC FIBERS summer project pal 13 24,662 02-11-2015, 12:29 PM
Last Post: Guest
  New Techniques Of Waste Water Management computer science crazy 9 16,435 18-08-2014, 05:44 AM
Last Post: Guest
  trenchless technology full report project report tiger 17 17,123 11-07-2014, 10:43 PM
Last Post: ahamed fidha
  DESIGNING FOR CONSTRUCTION WORKER SAFETY super 5 8,760 01-07-2014, 03:11 AM
Last Post: Charlesapot
  RAINWATER HARVESTING full report and ppt project topics 11 25,207 27-03-2014, 01:14 AM
Last Post: onkarok9294
  skylights full report computer science technology 4 6,170 02-11-2013, 01:05 PM
Last Post: sac louis vuitton pas cher
  geopolymer concrete full report project report tiger 11 23,067 16-05-2013, 09:34 AM
Last Post: Guest

Forum Jump: