construction challenge for bridge in hilly area journal pdf
#1

Construction challenges for bridges in hilly areas
Reply
#2

 Building foundations for any large bridge takes time. The problems encountered during the construction of the foundation depend on the type of foundations, the strata of the soil found, the equipment / plant deployed and the logistical problems. The construction difficulties anticipated during execution must be taken into account when planning the works / period for the work. The foundation can be opened with foundations, pile bases, foundations or any other type of foundations. In the case of a good base, there are several types of soil and it is difficult to give a clear timetable on the sinking of the wells unless the details of the soil are very clear and the profile anticipated matches the real one found. In the case of stony and clayey soils, the rate of subsidence is likely to be slow compared to sandy soil. There may also be a requirement for the pneumatic sinking technique subsequent to the open grip due to difficulties in the sinking of the well. As the cost of pneumatic sinking is very high, this should be implemented judiciously. In such cases, it is necessary to keep the details of all sinking difficulties in a systematic order and this can be reviewed in consultation with the decision-making authority.

The Himalayas have been considered as a vast repository of valuable medicinal herbs, minerals, forest resources, etc., since the Vedic era. While the Vedic literature followed by the writings of Susruta, Charaks, Nagarjuna, Dhanwantri, Balmiki, Parashar and several other saints, they give a statement about it. "Alexander, The Great", which was heavily influenced by its scenic beauty, healthy climate and agroclimatic conditions, made a great publicity of Himalayan Herb Science in Yunnan and Rome during the Middle Ages. This potential, however, remained untapped, especially at the highest levels due to the inadequacy of the media. Although after independence, the Government of India, made a unique emphasis on the construction of roads to lead to the socioeconomic elevation of the inhabitants of the tribes. But due to the lack of proper planning, it produced serious ecological imbalances.

The construction of foundations for any large bridge takes time and the problems encountered during the construction of foundations depend on the type of foundation selected, the layers of soil found, the equipment and plant deployed, and even the logistics problems play an important role. vital role. While the construction difficulties envisaged during execution can be kept in view while planning works during a period for work. However, the base can be opened with foundations, good foundations, pile bases or any other type of foundations.

In the case of a good base, there are several types of soil and it is difficult to give a clear timetable on the sinking of the wells unless the details of the soil are very clear and the profile anticipated matches the real one found. In the case of stony and clayey soils, the rate of subsidence is likely to be slow compared to sandy soil. There may also be a requirement for the pneumatic sinking technique subsequent to the open grip due to difficulties in the sinking of the well. As the cost of pneumatic sinking is very high, this should be implemented judiciously. In such cases, it is necessary to keep the details of all sinking difficulties in a systematic order and this can be reviewed in consultation with the decision-making authority.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: construction problem in hilly area pdf, construction challenge for bridges in hilly area powerpoinet presantation, road construction in a hilly area ppt, foundations in cleveland ohio, ppt on road construction in hilly area, construction challenge for bridge in hilly area, construction challenges for bridge in hilly area,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  seminar on movable bridge pdf 0 5,244 05-11-2020, 10:32 PM
Last Post:
  bascule bridge ppt 0 557 31-10-2018, 07:20 PM
Last Post: Guest
  ppt for underwater construction 2 885 05-10-2018, 06:31 PM
Last Post: sohailshaik868
  de sauty bridge viva questions 0 2,736 29-09-2018, 10:20 PM
Last Post: Guest
  Pamban bridge report and ppt 0 687 15-08-2018, 10:55 AM
Last Post: Guest
  download journal papers on new techniques of erosion control in hilly roads 0 681 12-08-2018, 11:12 PM
Last Post: Guest
  kochi industrialt visit area related to ece department 1 582 19-07-2018, 12:01 PM
Last Post: Guest
  bridge engineering by s ponnusamy pdf ebook 0 398 18-07-2018, 12:17 PM
Last Post: Guest
  seminar report on use of plastic waste in road construction 0 1,032 10-07-2018, 04:09 PM
Last Post: Guest
  use of recovered tyres in construction ppt 0 574 01-07-2018, 06:44 PM
Last Post: Guest

Forum Jump: