¢ Development of a Condition Based Preventive Maintenance Action for Coal Handling Plant of Thermal Power Station
¢ In the onsite operation phase, failures are the main causes of worsened performance and degraded reliability. Consequently, an effective maintenance is the main approach to failure reduction.
¢ The basic theory of condition Based Preventive Maintenance is to Propose routine inspection to identify any degradation in the integrity of the systems during their service life and to provide an early warning in order that remedial action can be taken before failure occurs.
Note :- Assessing the deteriorating condition is necessary to optimize inspection and maintenance schedules, of Coal Handling Plant to make decisions and to avoid unplanned outages.




¢ A Basic Layout of Coal Handling Plant

¢ Condition Monitoring Implementations: -
The steps in implementing CBM are :-
1. Divide Plant For Ease Of Maintenance
¢ Unloading Unit
¢ Feeding Unit
¢ Crushing & Screening Unit
¢ Stacking & Reclaiming Unit
¢ Bunkers
2. Detection Of Physical Parameters
3. In Service Examination By Using NDT
4. Analysis or Fault Diagnosis
5. Correction.
¢ Condition Measurement techniques :-
¢ In Service Examination By Using NDT :-



¢ Limitations

¢ As the plant operating conditions change, it makes it hard to compare the readings and the data scatter will be more difficult to trend.

¢ Condition based Maintenance may not easily achieve the confidence of maintenance, due to culture, management buy-in, or regulatory resistance.

¢ There needs to be a good balance between training of CBM technicians, good equipment for monitoring, knowledge of the equipment being monitored, and plant historical performance.

¢ Be aware of false indications and manage them so as not to discredit the programme.

¢ Data from the programme should be widely accessible.

¢ Although data management is very important, keep it simple so that it takes little time to get it instituted.

¢ Team work is a requirement for the programme to be successful.

¢ The CBM programme is not an all inclusive programme and must be balanced with other maintenance processes.



¢ References

¢ Technical paper on Quality Assured Maintenance Management For Coal Handling Plant by Makarand Joshi at web site plantmaintenancearticles/Maintenance_Management_QA.pdf
¢ Technical paper on Development and Implementation of Reliability centered Maintenance using Vibration Analysis: Experiences at Rourkela Steel Plant by S.Parida, N.R.Kotu, M.M.Prasad Research & Development Centre for Iron and Steel, Steel Authority of India Limited (SAIL), Rourkela Centre.
¢ Technical article received from web site http://wemg.co.uk of WM Engineering Ltd.
¢ Technical paper on Maintenance Method For Critical Equipments Of Coal Handling Plant by Makarand Joshi at web site plantmaintenancearticles/Critical_Equipment_Maintenance.pdf
¢ Technical paper on Application & Implementation of Residual Life Assessment Techniques For Coal Handling Plant by Makarand Joshi presented in National Seminar of The Indian Society For Non Destructive Testing 5-7 December 2002 at Chennai.
¢ Thankyou
Q/A
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: coal fired boiler training, english action song competition ankering, preventive maintenance substation gis checklists, compressive strength of coal, information coalsurface coal mining, list of best action, maintenance coal and salt earthing system,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  SCADA CONTROLLING AUTOMATIC BOTTLE FILLING PLANT smart paper boy 1 2,869 18-02-2012, 04:11 PM
Last Post: seminar paper
  Structural and thermal analysis of gas turbine casing project report maker 8 5,205 18-01-2012, 10:28 AM
Last Post: seminar addict
  ROBOTIC TROLLEY FOR MATERIAL HANDLING seminar class 4 5,133 16-11-2011, 09:30 AM
Last Post: seminar addict
  Nuclear Reactor Thermal-Hydraulics & Safety seminar class 0 1,593 08-03-2011, 02:30 PM
Last Post: seminar class
  THERMAL REFREGERATION BASED PROJECTS seminar surveyer 0 2,435 01-01-2011, 03:52 PM
Last Post: seminar surveyer
  INTEGRATED STEEL PLANT project report helper 0 2,008 28-10-2010, 03:02 PM
Last Post: project report helper
  ADVANCES IN POWER PLANT STEAM BLOW CLEANING ANALYSES project report helper 0 1,243 16-10-2010, 01:59 PM
Last Post: project report helper

Forum Jump: