REAL TIME FLOOD FORECASTING full report
#1

[attachment=1810]

REAL TIME FLOOD FORECASTING


INTRODUCTION

What Is Real Time Flood Forecasting ??
Real Time Flood Forecasting systems are formulated for issuing the flood warnings in real time in order to prepare the evacuation plan during flood.


FLOOD PROBLEMS IN INDIA

a) Inundation.
b) Drainage Congestion due to Urbanization.
c) Bank Erosion.


FOUR ZONES OF FLOODING IN INDIA

a) Brahmaputra River Basin.
b) Ganga River Basin.
c) North “West Rivers Basin.
d) Central India and Deccan Rivers Basin.


SPECIAL FLOOD PROBLEMS

a) Problems Of Tal Areas.
b) River Bank/Bed Erosion.
c) Sediment Transport by Rivers.
d) Dam Break Flows.
e) Urban Drainage.
f) Flash floods.
g) Flood due to snowmelt.
h) Flood in Coastal Areas.


NEED FOR REAL TIME FLOOD FORECASTING

a) To evacuate the affected people to the safer places.
b) To make an intense patrolling of the flood protection works such as embankments so as to save them from breaches , failures, etc.
c) To regulate the flood through barrages and reservoirs.
d) to operate multi-purpose reservoirs.
e) to operate city drains.


DEVELOPMENT OF FLOOD FORECASTING IN INDIA

In 1969, Government created a Central Flood Forecasting Directorate.
In 1970, six Flood Forecasting divisions were set up on inter state river basins.
In 1977, the central Flood Forecasting Organisation comprised of one Chief Engineerâ„¢s Office ,3 circles and 11 divisions.


FLOOD WARNINGS

Whether the river is rising above a certain specified level, known as danger level.
Whether the river is rising or falling.
Whether the stage of the river is Ëœlowâ„¢, Ëœmediumâ„¢ or Ëœhighâ„¢.


TECHNIQUE USED IN FLOOD FORECASTING

The Real Time Data Acquisition System.
This technology assembles simple ideas to get effective results.
The project implements machine to machine communication.
Using this system the information are collected from remote places.


WORKING PROCEDURE

Internet based technology make it easier to control & monitor the system remotely to present it easier using standard web browsers.
The system uses various sensors for detecting rainfall intensity for sensing the water level of the river.
The data is first stored in data logger, which supports CDMA transmissions.
The data is stored and transmitted at a predefined interval.
The data is transmitted through wireless medium over the internet to a data base.
Then it is analysed and hosted in the website for general information.


FEATURES OF THE PROJECT

This project is intended for collecting the data for rainfall and water level for the areas covered by Ganga basin.
The data collected from the mapped sites are to be posted through CDMA over the internet to a data base server.
All the equipments used in this system incorporates state of the art and technology ( eg. microcontroller, processors etc) and provide capability for unattended operation for at least 1 year at remote places using 12 v single sealed maintenance free battery.
Solar supply has been arranged for that area where the electricity is inaccessible.
All the equipment has been able to withstand the hostile environment and well secured against power surge electrostatic discharge etc.
The system has an inbuilt memory that is able to store data for at least one year.


SENSORS

The sensors along with the accessories and facilities for flood fore casting system are basically Tipping Bucket Rain Gauge, water level detecting sensor.
a) water level detecting sensor: The water level sensor being used in the Stevenâ„¢s A/F Encoded mode A F-1.
b) Rain Gauge: Tipping bucket rain gauge.


CONCLUSION

The real time flood forecasting system protects lives and save money. The real time data acquisition system is necessary for food forecasting as the data can be collected every five minutes from the mapped station. The apex advantage of real time data acquisition system is that data is retrieved in real time. In INDIA flash floods are usually experienced, as such there is no system for formulating the flash flood forecast. It results heavy losses of lives and properties. The real time data acquisition system can be used to prevent losses due to flash floods.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: a short paragharp on flood in hindi, information of flood in hindi language wikipedia, ppt of real time for flood forecasting**22## **marketing mix of toyota corolla, flood warning systemfor railways usingultrasonic waves, seminar report on demand forecasting, advantages and disadvantages of boundary filled algorithm and flood filled algorithm, flood sensor alarm,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  RAINWATER HARVESTING AND ARTIFICIAL RECHARGE TO GROUND WATER full report project report tiger 11 11,848 17-12-2015, 02:13 PM
Last Post: seminar report asees
  trenchless technology full report project report tiger 17 17,180 11-07-2014, 10:43 PM
Last Post: ahamed fidha
  RAINWATER HARVESTING full report and ppt project topics 11 25,306 27-03-2014, 01:14 AM
Last Post: onkarok9294
  skylights full report computer science technology 4 6,186 02-11-2013, 01:05 PM
Last Post: sac louis vuitton pas cher
  geopolymer concrete full report project report tiger 11 23,172 16-05-2013, 09:34 AM
Last Post: Guest
  green concrete full report project topics 9 37,190 12-03-2013, 12:45 PM
Last Post: computer idea
  global warming full report project report tiger 16 25,619 02-03-2013, 11:58 AM
Last Post: seminar details
  green buildings for quality living full report project report tiger 5 10,237 16-02-2013, 10:44 AM
Last Post: nagarjun ks
  CONSTRUCTION WASTE RECYCLING full report project topics 10 13,730 08-02-2013, 10:23 AM
Last Post: seminar details
  nanotechnology in construction full report project report tiger 8 9,846 19-01-2013, 06:20 PM
Last Post: Guest

Forum Jump: