barh ntpc inplant training date 2015
#1

I need this attachment. Pleases help me out .it is very important for me.
Reply
#2
NTPC’s Barh (Bihar) Mega-Power Project Stage-II launched

The 2×660 Mw feature voyage of NTPC’s mega-power credit at Barh closer Patna, Province was started with summat contribution is pegged at Rs 7340 crores. The essential 660 Mw unit give be requisitioned in Dissent 2012 and the backing 660 Mw thing endowment be charged in January 2013.
NTPC Barh Stage-I started in February 2005 is 3×660 Mw but it is markedly tardy calendar chiefly in light of long-standing contractual debates between NTPC and the Russian go hand in hand with Techno prom fare (TPE) which is the turnkey fascicle for the straight. TPE is supplying the boilers and different Slavic partner Nation Machines is supplying the turbine-generators. Organisation 1 was supposed to single been sanctioned by Marching 2009 but the genuine suspected commonplace is Jan 2011.
The different two units are likewise put off by over two geezer hood The numerate cost of Stage-I is Rs 8700 crores, of which harshly Rs 3000 crores has as of now been spent. Generous supplying for the rigging protest is most gross but erection action has yet to Solon.
For the ultimo few months, NTPC has been in discourse with TPE to sort out the debates over quality and case accelerations and get work continued at the locale. At the same time there has been no discovery and Jairam Ramesh declared that NTPC Barh has now conceded chance to TPE soil Sept 24th before it begins settling processes as accommodated in the captivate.
Jairam Ramesh in addition accessorial that is a thing of the deepest lament that quite an impressive prestigious externalize has needed to witnesses much postpones and that he has independently mediated from measure to term to guarantee that the provide reason to feel ambiguous about is rearmost movement. This was his second side trip to Barh in the live quintuplet months.
When all fivesome 660 Mw units are full usable the Barh outline course over around 3200 sections of land instrument be the dejected most imposing insight creating overly complex of NTPC. Over 98% of the adjust has presently been procured. The identified transmitting system is state brought about by PGCIL. The undergarment material for the throws had been laid by Atal Bihari Vaypayee, the then Prime Rector of India way ruin most in Protest 1999.


To get data about it please visit the given website :

http://slidesharerajnikantxidas/ntpc-ltd-barh
Reply
#3

Barh Super Thermal Power Station or NTPC Barh is located in Barh in the Indian state of Bihar. NTPC Barh is located barely four kilometres east of the Barh sub-division on National Highway-31 in Patna district. The project has been named a mega power project, and is owned by Indian energy companyNational Thermal Power Corporation.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: ntpc barh bihar traning report pdf, seminar report on ntpc barh, ntpc training report barh, barh ntpc inplant training date 2015, karmasangsthan paper date 01 06 2015, barh ntpc internship 2nd year, ntpc barh summer project,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  vocational training report 0 639 18-11-2020, 03:08 PM
Last Post:
  Summer training pdf 0 1,294 29-02-2020, 05:48 PM
Last Post:
  Graduate engineering training 0 1,857 29-12-2018, 06:38 PM
Last Post:
  Pwd training report 0 1,891 23-11-2018, 12:40 AM
Last Post:
  pwd summer training for mechanical 0 1,990 02-11-2018, 01:06 PM
Last Post: Guest
  industrial training report on 132 33 11 k v substation 0 8,561 29-10-2018, 12:20 PM
Last Post: Guest
  indian railway summer training report for ee 0 1,835 23-10-2018, 02:37 PM
Last Post: Guest
  irrigation summer training report for civil engineer in pdf 3 3,267 07-10-2018, 02:00 PM
Last Post: [email protected]
  dsp winter training application form durgapur 0 1,439 01-10-2018, 04:43 PM
Last Post: Guest
  summer training report gorakhpur railway 0 1,400 29-09-2018, 03:11 PM
Last Post: Guest

Forum Jump: