bank management system project in vb
#1

[attachment=3799]
[attachment=3798]


BANK MANAGEMENT SYSTEM

ABSTRACT:

Requirements definition and management is recognized as a necessary step in the delivery of successful system s and software projects, discipline is also required by standards, regulations, and quality improvement initiatives. Creating and managing requirements is a challenge of IT, systems and product development projects or indeed for any activity where you have to manage a contractual relationship. Organization need to effectively define and manage requirements to ensure they are meeting needs of the customer, while proving compliance and staying on the schedule and within budge. The impact of a poorly expressed requirement can bring a business out of compliance or even cause injury or death. Requirements definition and management is an activity that can deliver a high, fast return on investment.

The BANK MANAGEMENT SYSTEM undertaken as a project is based on relevant technologies. The main aim of this project is to develop software for bank management system. This project is to develop software for bank management system. This project has been developed to carry out the processes easily and quickly, which is not possible with the manuals systems, which are overcome by this software. This project is developed using VB language and. Hence it provides the complete solution for the current management system.

REQUIREMENT ANALYSIS:

Requirements are prone to issues of ambiguity, incompleteness, and inconsistency. Techniques such as rigorous inspection have been shown to help deal with these issues. Ambiguities, incompleteness, and inconsistencies that can be resolved in the requirements phase typically cost orders of magnitude less to correct than when these same issues are found in later stages of product development. Requirements analysis strives to address these issues.
¢ Take a long time to produce
¢ Begin to limit the implementation option available
¢ Are costly to produce
Requirements for both the system and the software are documented and reviewed with the customer.


IMPLEMENTATION:

Implementation is the realization, application, or execution of a plan, idea, model, design, specification, standard algorithm, or policy.

The design must be translated in to machine-readable form. The code generation step performs their tasks. If design is performed in a detailed manner, code generation can be accomplished mechanistically.

Maintenance:


In software, software maintenance is the process of enhancing and optimizing developed software (software release), as well as remedying defects. Software maintenance is one of the phases in the software development process, and follows development of software into the field. The software maintenance phase involves changes to the software in order to correct defects and deficiencies found during field usage as well as the addition of new functionality to improve softwareâ„¢s usability and applicability.

Conclusion:

When looking for solid accounting software, you want to find a solution that gives you the best value for your investment. Naturally, you first the software that meets your needs, both now and in the future. Engineering is based on designing different projects. Nowadays, most products and system are becoming more complex in nature, and there is an increasing demand relative to new technology application at a time when our natural resources are dwindling now thatâ„¢s where engineering and engineers are not only useful for the technologies and machineries in the business world, but it is also constructive in different components of business such as management, financing, employment, and marketing.
Reply
#2
I am not able to run this project on my computer., it gives an error in registry and cannot load MACAL.OCX.
Does this project really work or not ?
Please tell me how to run it. My email address is given below:
ankitanudeep[at]gmail.com
Reply
#3
What is the username and password ?
ankitanudeep[at]gmail.com
Reply
#4


To get more information about the topic " bank management system project in vb" please refer the page link below
http://studentbank.in/report-bank-manage...7#pid55657
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Tagged Pages: pdf bank management project vb 2010,
Popular Searches: left bank management, bank management system project report pdf, bank management system project in vbect, piggy bank project, bank management project algorithm, project report on bank management system pdf, bank management system project in c,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  event management system project report tiger 3 6,347 30-08-2017, 12:43 PM
Last Post: jaseela123d
  blood bank system project report tiger 13 13,906 15-07-2017, 03:07 PM
Last Post: jaseela123d
  Development of a Recipe Management System seminar topics 1 3,027 24-04-2017, 10:17 AM
Last Post: Zakir Hussain
  The impact of technology on queue management system holax 1 1,409 14-07-2016, 02:39 PM
Last Post: seminar report asees
  School Management System project topics 9 8,446 27-06-2016, 09:23 AM
Last Post: computer science crazy
Smile school management system amrita 2211 4 5,568 27-06-2016, 09:23 AM
Last Post: computer science crazy
  Employee Cubicle Management System full report computer science technology 4 5,091 07-04-2016, 11:37 AM
Last Post: dhanabhagya
  Attendance Management System mechanical engineering crazy 18 23,356 05-04-2016, 09:50 AM
Last Post: dhanabhagya
  banking system project project topics 10 22,826 22-01-2016, 02:12 PM
Last Post: seminar report asees
  warehouse management system project report tiger 3 4,139 17-12-2015, 02:23 PM
Last Post: seminar report asees

Forum Jump: