1. Introduction
This report presents work done on Automated Circuit Breaker Monitoring project during
the year of 2006. Previous work is described in annual reports for 2003 and 2005. During
year 2006, we have developed two CBM devices. Both devices are installed in
CenterPoint Energy 345kV substation Obrien in south Houston. The first CBM device -
CBM1 is installed a year ago. The second one, CBM 2, has implemented new features:
New signal conditioning board, communication protocol and time synchronization.
Detailed Functional Requirement Specification for Automated Circuit Breaker
Monitoring system is given in Appendix. Final reports for year 2003 and 2005 are also
provided in the Appendix.

2. CBM
Signal conditioning boar, communication protocol and time synchronization module have
been modified and upgraded during the 2006. These modifications are necessary to enable
I jmonitoring over the entire power system and to reduce cost of the device.

2.1 Signal Conditioning Module
New signal conditioning board with better over voltage protection on input side is
developed, tested in lab and installed as a part of CBM 2 device. It limits the maximum
voltage on the input amplifier to 220V, which is harmless for amplifiers. Functionality of
new signal conditioning board is shown in Figure 1.1. It has implemented two features:
over voltage protection and voltage level conditioning. Over voltage protection is realized
with high voltage suppression Zener diodes.



2.2 Communication Protocol
New communication protocol for CBM provides multipoint communication and time
synchronization enabling usage of several CBMs in one substation. We established pointto-
multipoint communication network. Considering the fact that concentrator has to
communicate with more than one DAU at the time, the main idea is that concentrator is
polling all of DAUs in a schedsuled way in order to determine if any of DAUs has a file
to send. If it has, the Master unit initiate file transfer. The Master unit communicates with
slaves using comands. Commands are divided in two parts. In the first part master sends
CBM ID and in the second part it sends command to be executed.



2.3 Time Synchronization
Time Synchronization is implemented in the CBMs using a GPS clock receiver and
wireless modems for time distribution to devices in a switchyard. The GPS
Synchronization signal (1PPS) is distributed from the master radio modem located in the
control house to the slave units at each CBM device. In this way only one GPS receiver
per substation is needed. Radio modems used for CBM have implemented the option for
1PPS distribution from master modem to several slave units.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: automated alarm circuit, ppt on automated wavepipelined circuit using asic, shelipaln, boar shelipaln mahiti**age of auto irrigation system, bndiadt shelipaln,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  PC BASED SUBSTATION MONITORING AND CONTROLLING USING RF seminar details 4 7,147 17-09-2016, 12:58 PM
Last Post: Guest
  ELECTRICITY GENERATION FROM SPEED BREAKER seminars report seminar paper 4 5,592 07-04-2016, 11:51 AM
Last Post: dhanabhagya
  Radio frequency based real time Child Monitoring and alarm system simple details seminar addict 1 2,021 06-09-2014, 06:45 PM
Last Post: Guest
  AUTOMATED CAR BRAKING SYSTEM USING FUZZY LOGIC CONTROLLER project uploader 3 3,826 15-05-2013, 09:52 AM
Last Post: computer topic
  Automated Guided Vehicle ( AGV ) seminar addict 1 1,895 24-11-2012, 12:15 PM
Last Post: seminar details
  AUTOMATED ALARM CIRCUITS project uploader 1 1,403 17-11-2012, 12:15 PM
Last Post: seminar details
  SF6 Circuit Breaker Abstract project uploader 1 2,804 31-10-2012, 01:47 PM
Last Post: seminar details
  Design and Implementation of PLC-Based Monitoring Control System for Three-Phase seminar details 0 1,945 09-06-2012, 12:58 PM
Last Post: seminar details
  Automated train station seminar details 0 698 05-06-2012, 05:42 PM
Last Post: seminar details
  Application of ZigBee for Pollution Monitoring Caused by Automobile Exhaust Gases seminar details 0 1,390 05-06-2012, 05:25 PM
Last Post: seminar details

Forum Jump: