Assurance Evaluations for Test of Communication-Based Train Control System
#1

The development of a GSM automatic power meter reading (GAPMR) system is presented in this paper. The GAPMR system is consists of GSM digital power meters installed in every consumer unit and an electricity ebilling system at the energy provider side. The GSM digital power meter (GPM) is a single phase IEC61036 standard compliance digital kWh power meter with embedded GSM modem which utilize the GSM network to send its power usage reading using short messaging system (SMS) back to the energy provider wirelessly. At the power provider side an ebilling system is used to manage all received SMS meter reading, compute the billing cost, update the database, and to publish billing notification to its respective consumer through SMS, email, Web portal and printed postage mailing. A working prototype of the GAPMR system was build to demonstrate the effectiveness and efficiency of automatic meter reading, billing and notification through the use of GSM network
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: test t, quality control and assurance systems, software assurance, interview question for quality assurance in pharma pdf, raa learners test, quality assurance and quality control in civil engineering pdf, iq test,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  INTEGRATED EMERGENCY RESPONSE SYSTEM USING EMBEDDED SYSTEM seminar presentation 1 9,538 19-11-2018, 08:40 PM
Last Post:
  AUTOMATIC STREET LIGHT CONTROL WITH SENSOR TECHNOLOGY seminar class 2 12,114 22-05-2017, 11:07 AM
Last Post: yasminoth93
  VECTOR CONTROL DRIVE OF PERMANENT MAGNET SYNCHRONOUS MOTOR USING MATLAB/SIMULINK seminar class 2 12,633 05-04-2017, 01:18 PM
Last Post: surya256
  Voice Based Automated Transport Enquiry System seminar class 2 3,258 05-10-2016, 09:34 AM
Last Post: ijasti
  GSM based Control Panel for Agricultural and Domestic Water Pumps seminar addict 4 25,676 08-09-2016, 10:58 AM
Last Post: ijasti
  Wireless Communication – ZigBee / Bluetooth / RF / IR based major projects for ECE project topics 9 19,735 16-07-2016, 03:45 PM
Last Post: jaseela123d
  MICROCONTROLLER BASED DAM GATE CONTROL SYSTEM full report seminar class 13 17,794 19-06-2016, 07:53 PM
Last Post: Saianjana
  WIRE LESS SPEED CONTROL OF AC MOTOR (USING MOBILE) smart paper boy 6 11,801 24-02-2016, 02:05 PM
Last Post: seminar report asees
  AUTOMATIC STREET LIGHT CONTROL-EMBEDDED BASED PROJECT project topics 18 31,245 11-02-2016, 02:03 PM
Last Post: seminar report asees
  Wireless based Automatic dam water level control shutter open /closed with emergency smart paper boy 4 11,845 11-09-2015, 02:00 PM
Last Post: seminar report asees

Forum Jump: