Hello sir, I am ATTI MURUGAN V , I would like to get details on applying INPLANT TRAINING IN ENOORE POWER PLANT training. Now I am studying B.E MECHANICAL ENGINEERING , since I am in the final year of my studies this implant training will help to build my career. so, please accept this request for training.
Thanking you,
yours faithfully,
v. Atti murugan
Posts: 14,118
Threads: 61
Joined: Oct 2014
The Ennore Thermal Power Plant is a coal-based power plant located in Chennai Ennore, Tamil Nadu. The Ennore thermal power plant was built to serve the purpose of power generation in the year 1970. It is one of the four main thermal power stations in Tamil Nadu established by TANGEDCO. At present it has an installed capacity of 450 MW (600,000 CV). The necessary coal comes through the vessel to the port of Ennore, however, the construction of 1,000 MW (1,300,000 CV) plants of two units of 60 MW and three of 110 MW A 500 MW unit was proposed based on coal and its development began in November 2007. The total cost of the company was 270 crores. 03.31.2017 and will be replaced.
The plant has been a major supplier of electricity in the state and its production capacity has been improved over the years. The Ennore Power Station has also garnered several awards from TANGEDCO. However, the energy deficit appears to be playing an important role for the recent decision. It also has a special treatment plant to arrange the ash suspension in a suitable way.
Hello sir I'm V.karthickkishorekumar studying BE mechanical engineering at velammal engineering college since I'm on 3 rd year I wish to attend inplant training to develop my technical skills... Please tell me the procedure...