Advantages of Prestressed Concrete Bridges
#1

Advantages of Prestressed Concrete Bridges



Owners and designers have long recognized the low initial cost, low maintenance needs and long life expectancy of prestressed concrete bridges. This is reflected in the increasing market share of prestressed concrete, which has grown from zero in 1950 to more than 55 percent today.

This growth continues very rapidly, not only for bridges in the short span range, but also for spans in excess of 150 feet which, heretofore, has been nearly the exclusive domain of structural steel.

The following examples illustrate some of these key advantages of precast, prestressed concrete bridges:

Many bridge designers are surprised to learn that precast, prestressed concrete bridges are usually lower in first cost than all other types of bridges.
Coupled with savings in maintenance, precast bridges offer maximum economy.


The precast prestressed bridge system offered two principal advantages:
it was economical and it provided minimum downtime for construction. Project duration was three weeks.

The state of Minnesota saved more than 16% - a half a million dollars – by planning for a prestressed alternate to a steel bridge.
The 700-foot-long bridge is jointless up to the abutments and is the longest continuous bridge in the state. It also contains the longest single concrete span.

A Minnesota transportation official stated, “Originally, we didn’t think concrete was suited to this… bridge. However, the fabricator showed us it was a viable alternative. Everything went smoothly… we’re well satisfied…”

Precast, prestressed concrete bridge components are easy to erect, particularly when the tops of the units comprise the entire deck slab to form an “integral deck” or “full-deck” beam.

In a full-deck bridge, the formwork of the super­structure is eliminated. Connections between adjacent units often consist of welding matching plates and grouting continuous keyways. Carefully planned details speed the construction process and result in overall economy.

…but it may be easier and more economical to build new ones, or to utilize precast abutments and wing walls supported on cast-in-place footings. Because precast concrete integral deck bridges with precast abutments can be erected without delay in cold weather, they can be opened to traffic sooner.

Bridge departments are challenged to maintain traffic flow, minimize traffic interruptions, and reduce or eliminate detours during construction projects.
This Florida bridge, damaged in a tanker fire, was completely rebuilt and opened to traffic in 18 days.

The fast construction of precast concrete integral deck bridges is a key advantage. Precast concrete bridges can be installed during all seasons and opened to traffic more rapidly than any other permanent type of bridge, because of the availability of plant-produced sections and the speed of erecting and finishing construction.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: watt deck, advantages of precast bridges, prestressed concrete structures 7th sem, prestressed concrete box beams, advance prestressed concrete topics, prestressed concrete pavement ppt, when will minnesota golf,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  SELF-COMPACTING CONCRETE project uploader 1 2,369 12-10-2012, 11:40 AM
Last Post: seminar details
  Concrete Superplasticizers seminar details 0 972 09-06-2012, 12:14 PM
Last Post: seminar details
  ECO- concrete seminar details 0 933 06-06-2012, 12:50 PM
Last Post: seminar details
  STUDY ON DURABILITY OF FLYASH CONCRETE seminar details 0 846 05-06-2012, 12:54 PM
Last Post: seminar details
  DUCTILITY DESIGN OF REINFORCED full report CONCRETE APARTMENT BUILDING seminar paper 0 901 14-03-2012, 04:27 PM
Last Post: seminar paper
  Ductility Design of Reinforced Concrete Apartment Building seminar paper 0 788 14-03-2012, 04:21 PM
Last Post: seminar paper
  GLASS FIBER REINFORCED CONCRETE project uploader 0 1,254 13-03-2012, 12:15 PM
Last Post: project uploader
  Lecture 36 Concrete Design seminar paper 0 781 09-03-2012, 03:17 PM
Last Post: seminar paper
  Features, Advantages and Disadvantages of a Methodology seminar paper 0 1,006 09-03-2012, 01:58 PM
Last Post: seminar paper
  PROPERTIES OF GEAR MATERIAL AND THEIR ADVANTAGES seminar paper 0 873 03-03-2012, 04:47 PM
Last Post: seminar paper

Forum Jump: