Student Seminar Report & Project Report With Presentation (PPT,PDF,DOC,ZIP)

Full Version: dsp winter training application form durgapur
You're currently viewing a stripped down version of our content. View the full version with proper formatting.

Guest

I m student of B.tech mechanical engineering 2nd year .I want winter internship in 2017
The Durgapur steel plant was established in the late 1950s with an initial production capacity of 1 MPTA (million tons per year) of crude steel that progressively increased to 1.8 MTPA during the last modernization in the 1990s with the primary objective of achieving a higher level of production. improvement of productivity and quality, conservation of energy, reduction of production cost and minimization of environmental pollution.